Operations Report – Nov 11th

Crew 215 Operations Report 11-NOV-2019
SOL: 1
Name of person filing report: Shane Usher

Non-nominal systems: Opportunity, Suit 10, Suit 5 Helmet, No power to multiple downstairs wall sockets.

Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not functioning (fuse type 5 is blown), Suit 5 Helmet falling apart, Suit 2 Battery supplying low power. Loft Tank Feed tank leaky (temporarily fixed with gaffer tape).
The water pump is very loud.

Generator: run
Hours run: 12h 30 min
From what time last night: 1800
To what time this morning: 0730
List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before generator is run at night): 78%
Diesel Reading – 54%
Station Propane Reading – 74%
Ethanol Free Gasoline: N/A

Water (loft tank): 55 gallons
Water Meter: 1457225 units
Water (static tank): 304 gallons (not filled)
Static to Loft Pump used – yes
Water in Green Hab: 225 gallons – 28 L (7 gallons) used
Water in Science Dome: 0 gallons

Toilet tank emptied: no

Deimos rover used: not at hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Spirit rover used: yes
Hours: 110.0
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 100%
Currently charging: yes.

Opportunity rover used: no
Hours: 65.6
Beginning charge: 100%
Ending charge: 100%
Currently charging: no

Curiosity rover used: yes
Hours: 115.7
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 100%
Currently charging: yes

Notes on rovers: no
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used: 0 Gals
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director

HabCar used and why, where? With DIRECTOR
CrewCar used and why, where? At Grand Junction awaiting Crew 216

General notes and comments: N/A

Summary of internet: Functional today, but CAPCOMs was down in the evening on Sol 0.
Summary of suits and radios: Suit 2 needs a replacement battery, Suit 5 Helmet falling
apart, Suit 10 requires type 5 fuse.
Summary of Hab operations: All systems nominal apart from; Stateroom5, Edison screw lightbulb Max 13W required; Fire alarm test button not working in Hab upper level; Fire alarm test button disintegrated in GreenHab; Numerous powerpoints not functional on the ground floor of hab. The water pump is very loud.
Summary of GreenHab operations: Atmospheric equalization to the green hab was carried out during the day, plants were watered (28L). The heater automatically came on at 5 pm.
Summary of Science Dome operations: All systems nominal.
Summary of RAM operations: Not used
Summary of any observatory issues: Nominal
Summary of health and safety issues: All crew healthy

Questions, concerns and requests to Mission Support: Static tank topped up to approximately 350 L. Water heater unusable. Opportunity is currently unusable.
We need advice about how we can obtain a replacement battery and fuse (type 5) for Suits. Loft tank feed pipe needs a new hose connection to eliminate the leak. We might be able to improve the current setup with Teflon tape and duct tape.

Supplemental:

Supply Request List:
12-volt lead-acid battery – Suit 2 Hab ground floor
Fuse (Type 5) – Suit 10 Hab ground floor
Fire smoke alarm – Hab upper level
Fire smoke alarm – GreenHab
Water Pump – water tank outside next to Hab?
Water tank feed hose connection – Loft
Gaffer Tape – RAM
Teflon tape – RAM
Electrical Service: Powerpoint not functioning – Hab ground floor near the hot water system
Safety: Static electric shock becoming significant around the Hab

Operations Report – Nov 9th

[title Operations Report – November 9th]

[category operations-report]

Crew 214 Operations Report 9-11-2019
SOL: 13
Name of person filing report: Andrew Wheeler
Non-nominal systems: Opportunity, Suit 10
Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not functioning
Generator: run
Hours run: 13h
From what time last night: 1815
To what time this morning: 0715
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night): 70%
Diesel Reading – 55%
Station Propane Reading – 76%
Ethanol Free Gasoline: N/A
Water (loft tank): 41 gallons
Water Meter: 1456896 units
Water (static tank): 150 gallons (not filled)
Static to Loft Pump used – yes
Water in Green Hab: 225 gallons
Water in Science Dome: 0 gallons
Toilet tank emptied: yes
Deimos rover used: not at hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Spirit rover used: no
Hours: 109.2
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 100%
Currently charging: yes
Opportunity rover used: no
Hours: 65.6
Beginning charge: 100%
Ending charge: 100%
Currently charging: no
Curiosity rover used: no
Hours: 115.0
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 100%
Currently charging: yes
Notes on rovers: no
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used: 0 Gals
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director
HabCar used and why, where? N/A
CrewCar used and why, where? CrewCar to Grand Junction and return for Crew 215
General notes and comments: N/A
Summary of internet: Functional
Summary of suits and radios: Nominal
Summary of Hab operations: All systems nominal
Summary of GreenHab operations: Atmospheric equalization to the green hab was carried out during the day, plants were watered. The heater automatically came on at 5pm.
Summary of Science Dome operations: All systems nominal.
Summary of RAM operations: Not used
Summary of any observatory issues: Nominal
Summary of health and safety issues: All crew healthy
Questions, concerns and requests to Mission Support: Static tank not filled. Water heater unusable. Opportunity is currently unusable.

Operations Report – Nov 9th

[title Operations Report – November 9th]

[category operations-report]

MDRS Supplemental Operations Report 8-NOV-2019

Name of person filing report: Shannon Rupert

Reason for Report: Work done by staff for beginning of the season

Non-nominal systems: n/a

Action taken for non-nominal systems: n/a

Generator check, note if oil and coolant added: coolant added. We
still have a very small diesel leak to the generator and are
investigating a possible oil leak in the engine.

ScienceDome AC unit, on and operational: nothing to report

Solar— Running nominally with nighttime generator backup

Diesel Reading – % not checked

Propane Reading – not checked

Ethanol Free Gasoline – n/a gallons.

Water (director’s tank) – n/a gallons

Water (static tank) – n/a gallons

Water (GreenHab) – n/a gallons

Water (loft) – This tank was cleaned today. Hose was replaced and the
leak fixed. We still need to cushion the hose so it doesn’t develop a
kink like the last one

Static to Loft Pump used – yes

Water Meter: n/a

Toilet tank emptied: nothing to report

Deimos rover used: Still not operational

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: Yes, operation nominal

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: Yes, operation nominal

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: Yes, brakes still an open issue. Buildup of
leaves from when it was in town caused an acid burn problem on the
batteries but they were cleaned today.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: Yes, operation nominal.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Notes and action taken on rovers: Names not replaced yet.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3). No. 300 still in town.

Reason for use: n/a

Oil Added? n/a

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used: none

Notes and action taken on ATVs: n/a

HabCar running? If used, why, where? HabCar was used to haul water
then taken for service on 5 Nov. Oil change and tire rotation were
completed but back brakes and wheel damage also needed repair, so it
is still off campus. To be retrieved on Monday.

CrewCar running, If used why, where? Yes, used to transport crew and
supplies back and forth to town and Grand Junction. It was off campus
from 5-8 Nov and had an oil change, tire rotation and check engine
light serviced. It was also cleaned inside and a full service
exterior wash and wax was done.

Campus wide inspection, if action taken, what and why? We removed a
bunch of ethernet cord running from the Hab to RAM. We suspect it was
part of a set up for the webcam but it was strung haphazardly and so
it will need to be replaced properly. Unfortunately it sustain some
damage and may need repair or replacement

Evidence of rodents, where and action taken: We seem to have more
rodents than we have had in years. Visitors are captured and removed
to the north. No house mice, only larger mice.

Summary of internet: All nominal. Business account needed a new
router/modem and was repaired on 4 Nov.

Summary of suits and radios: Nothing to report

Summary of Hab operations: New kitchen hardware arrived and was
delivered to Hab.

Loft water tank cleaned and repaired. The hose on top was replaced by
a new 4-foot RV hose. We tried to create a new electric plug for the
static tank, as the previous one melted last season and a temporary
cord has been used since then. We determined that the cord running
the pump was still safe and so we left it alone and will create a new
one for the tank heater running from the rear airlock plug. Not ideal
but it will work until the pump plug fails and then the system should
be replaced with an actual outlet. Someone plugged in the tank heater
while it was not in the water and so we need a new one.

We removed the two black office chairs installed by Ikea as part of
the refit and reinstalled the two sleeper loungers that had been
there. Crews use the loungers as a comfortable bonding space and the
two chairs were not conducive for that use. Covers have been ordered
to improve their outward appearance. We couldn’t put all four of them
back in place as the kitchen has been extended about 8 feet into that
space. We may put a third one back it we can find the hardware for
it.

Summary of Outpost operations: The intern trailer now has water- hot
and cold, heat, and wastewater tanks all operational. A propane tank
was installed at the front of the trailer, the same size as the one
for the director’s trailer. We fixed a small leak in the freshwater
tank and are finishing up with the cleaning/organization of the
trailer. We have not been able to get the refrigerator running on
propane. We have connected a 30 amp service from the power pedestal
to the trailer and everything seems nominal. The yard was enlarged so
the dogs would have more space.

Summary of GreenHab operations: Planting continues.

Summary of ScienceDome operations: Nothing to report

Summary of RAM operations: Nothing to report

Summary of any observatory issues: Nothing to report

Summary of health and safety issues: Nothing to report

List and summary of projects:

Tennis balls to protect the tarps on the tunnels: We purchased used
tennis balls to cap the t-posts in the tunnel instead of replacing the
urine cups we used to use as they fly away too easily with the wind.
It is very hard to cut the balls and even harder to get them on the
t-posts. But they should keep the tarps from ripping once the winds
start.

New food supply store at Rock Shop: We have received most of our food
supplies and have settled into our new and upgraded space. Some
things are still missing and/or the wrong size, but the funniest thing
was the amount of flour we received. Let’s just say we won’t run out
soon!

Questions, concerns, supplies needed and requests: Nothing at this time.

Operations Report – Nov 8th

Crew 214 Operations Report 8-11-2019

SOL: 12

Name of person filing report: Andrew Wheeler

Non-nominal systems: Opportunity, Suit 10

Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not functioning

Generator: run

Hours run: 13h 45m

From what time last night: 1745

To what time this morning: 0730

List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before generator is run at night): 76%

Diesel Reading – 55%

Station Propane Reading – 77%

Ethanol Free Gasoline: N/A

Water (loft tank): 20 gallons

Water Meter: 1456346 units

Water (static tank): 332 gallons

Static to Loft Pump used – no

Water in Green Hab: 225 gallons

Water in Science Dome: 0 gallons

Toilet tank emptied: yes

Deimos rover used: not at hab

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Spirit rover used: no

Hours: 108.8

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): 100%

Currently charging: yes

Opportunity rover used: no

Hours: 65.6

Beginning charge: 100%

Ending charge: 100%

Currently charging: no

Curiosity rover used: no

Hours: 114.7

Beginning charge: (Before EVA) : 100%

Ending charge: (On return from EVA, before charging): 100%

Currently charging: yes

Notes on rovers: no

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no

Reason for use: N/A

Oil Added? no

ATV Fuel Used: 0 Gals

# Hours the ATVs were used today: 0

Notes on ATVs: Assigned to the director

HabCar used and why, where? HabCar returned from service in Bicknell.

CrewCar used and why, where? CrewCar returned from service in Bicknell.

General notes and comments: N/A

Summary of internet: Functional

Summary of suits and radios: Nominal

Summary of Hab operations: All systems nominal

Summary of GreenHab operations: Atmospheric equalization to the green hab was carried out during the day, plants were watered. Additional seeds were catalogued in preparation for planting. GreenHab heater turned on automatically at 1700.

Summary of Science Dome operations: All systems nominal. Sample processing and experiments completed. All equipment used has been cleaned and returned to storage. Unused samples for ongoing experiments by Crew 215 placed in storage.

Summary of RAM operations: Not used

Summary of any observatory issues: Nominal

Summary of health and safety issues: All crew healthy

Questions, concerns and requests to Mission Support: Loft tank to be depleted to allow cleaning during crew changeover. Opportunity rover fully charged, however, the battery light is flashing and there is a bubbling sound coming from where the battery is located. It has been unplugged as a precaution.

Operations Report – Nov 6th

Crew 214 Operations Report 6-11-2019
SOL: 10
Name of person filing report: Andrew Wheeler

Non-nominal systems: Opportunity, Suit 10

Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not functioning

Generator: run
Hours run: 12h 40m
From what time last night: 1920
To what time this morning: 0800
List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before generator is run at night): 68%
Diesel Reading – 60%
Station Propane Reading – 80%
Ethanol Free Gasoline: N/A

Water (loft tank): 37 gallons
Water Meter: 1455889 units
Water (static tank): 223 gallons
Static to Loft Pump used – no
Water in Green Hab: 225 gallons
Water in Science Dome: 0 gallons

Toilet tank emptied: no

Deimos rover used: not at hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Spirit rover used: yes
Hours: 108.4
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 66%
Currently charging: yes

Opportunity rover used: no
Hours: 65.5
Beginning charge: 100%
Ending charge: 100%
Currently charging: yes

Curiosity rover used: yes
Hours: 114.3
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 74%
Currently charging: yes

Notes on rovers: no

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used: 0 Gals
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director

HabCar used and why, where? N/A
CrewCar used and why, where? N/A

General notes and comments: The generator failed to recharge the batteries during the night.

Summary of internet: Functional
Summary of suits and radios: Nominal
Summary of Hab operations: All systems nominal
Summary of GreenHab operations: Atmospheric equalization to the green hab was carried out during the day, plants were watered. 6 bags of soil obtained, which will be delivered to the Greenhab tomorrow.
Summary of Science Dome operations: All systems nominal. Sample processing following EVA was carried out and heating demonstration of hydrated minerals carried out.
Summary of RAM operations: Not used
Summary of any observatory issues: N/A
Summary of health and safety issues: All crew healthy
Questions, concerns and requests to Mission Support: N/A

Operations Report – November 05th

Crew 214 Operations Report 5-11-2019
SOL: 9
Name of person filing report: Andrew Wheeler
Non-nominal systems: Opportunity, Suit 10
Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not functioning
Generator: run
Hours run: 11h 15m
From what time last night: 1840
To what time this morning: 0655
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night): 65%
Diesel Reading – 60%
Station Propane Reading – 81%
Ethanol Free Gasoline: N/A
Water (loft tank): 47 gallons
Water Meter: 1455759 units
Water (static tank): 223 gallons
Static to Loft Pump used – yes
Water in Green Hab: 225 gallons
Water in Science Dome: 0 gallons
Toilet tank emptied: no
Deimos rover used: not at hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Spirit rover used: yes
Hours: 108.0
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 58%
Currently charging: yes
Opportunity rover used: no
Hours: 65.5
Beginning charge: 100%
Ending charge: 100%
Currently charging: yes
Curiosity rover used: yes
Hours: 113.9
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 56%
Currently charging: yes
Notes on rovers: no
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used: 0 Gals
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director
HabCar used and why, where? N/A
CrewCar used and why, where? N/A
General notes and comments: N/A
Summary of internet: Functional
Summary of suits and radios: 5 Radios and 3 earpieces that need servicing have been identified and set aside, the battery for suit 10 is fully charged and it is Suit 10 that is not functional, further information on Suit 5,s helmet has been forwarded to Capcom.
Summary of Hab operations: All systems nominal
Summary of GreenHab operations: Atmospheric equalization to the green hab was carried out during the day, plants were watered..
Summary of ScienceDome operations: All systems nominal. Sample processing following EVA was carried out.
Summary of RAM operations: Not used
Summary of any observatory issues: N/A
Summary of health and safety issues: All crew healthy
Questions, concerns and requests to Mission Support: Between 20191104:1140 and 20191105: 1100, the micrometeorite grid has been visited and trampled by at least one smallish adult (wearing boots). This has compromised a number of the plots in the unsampled area and will affect the integrity of the experiment. Whilst this is disappointing, we realize we are on public land and, in retrospect, we should have erected a temporary sign and barrier stating “please keep clear – monitoring in progress” to prevent this. We believe future rotations may benefit from this advice. We note that our daily reports identify the specific location where our field research is undertaken.

Operations Report – November 4th

Crew 214 Operations Report 4-11-2019
SOL: 8
Name of person filing report: Andrew Wheeler
Non-nominal systems: Opportunity, Suit 10
Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not functioning

Generator: run
Hours run: 13h 15m
From what time last night: 1845
To what time this morning: 0800
List any additional daytime hours when the generator was run: N/A
Solar— SOC % (Before generator is run at night): 94%

Diesel Reading – 60%
Station Propane Reading – 82%
Ethanol Free Gasoline: N/A

Water (loft tank): 32 gallons
Water Meter: 1455633 units
Water (static tank): 246 gallons
Static to Loft Pump used – no
Water in Green Hab: 225 gallons
Water in Science Dome: 0 gallons
Toilet tank emptied: yes

Deimos rover used: not at hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Spirit rover used: yes
Hours: 107.4
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 52%
Currently charging: yes

Opportunity rover used: no
Hours: 65.5
Beginning charge: 100%
Ending charge: 100%
Currently charging: yes

Curiosity rover used: no
Hours: 113.4
Beginning charge: (Before EVA) : 100%
Ending charge: (On return from EVA, before charging): 100%
Currently charging: yes

Notes on rovers: no

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no
Reason for use: N/A
Oil Added? no
ATV Fuel Used: 0 Gals
# Hours the ATVs were used today: 0
Notes on ATVs: Assigned to the director

HabCar used and why, where? N/A

CrewCar used and why, where? N/A

General notes and comments: N/A

Summary of internet: Functional
Summary of suits and radios: 5 Radios and 3 earpieces that need servicing have been identified and set aside, the battery for suit 10 is fully charged and it is Suit 10 that is not functional, further information on Suit 5’s helmet has been forwarded to Capcom.
Summary of Hab operations: All systems nominal
Summary of GreenHab operations: Atmospheric equalization to the green hab was carried out during the day, plants were watered.
Summary of ScienceDome operations: All systems nominal. Sample processing following EVA was carried out.
Summary of RAM operations: Not used
Summary of any observatory issues: N/A
Summary of health and safety issues: All crew healthy
Questions, concerns and requests to Mission Support: Acknowledge that the request for 6 radio batteries is being processed.

Supplement Operations Report – November 4th

MDRS Supplemental Operations Report 4-NOV-2019

Name of person filing report: Shannon Rupert

Reason for Report: Briefing on Work Party held at MDRS from Oct 22-25, 2019

Non-nominal systems: n/a

Action taken for non-nominal systems: n/a

Generator check, note if oil and coolant added: n/a

ScienceDome AC unit, on and operational: Needs refrigerant, but otherwise is ready to go. Will contact provider.

Solar— Ran nominally and without generator backup throughout the work party

Diesel Reading – % not checked

Propane Reading – 40 % (since then it has been refilled)

Ethanol Free Gasoline – n/a gallons.

Water (director’s tank) – n/a gallons

Water (static tank) – n/a gallons. Static tank was cleaned during
the work party.

Water (GreenHab) – n/a gallons

Water (loft) – This tank still needs to be cleaned and will be cleaned during the crew changeover from Crew 214 to 215. We also need to replace the current hose with a 4-6 foot RV hose (to be ordered)

Static to Loft Pump used – yes

Water Meter: n/a

Toilet tank emptied: yes. We also filled and emptied the tank three times to flush it after the summer break.

Deimos rover used: Still not operational. We are in the process of getting a trailer to take it for repairs.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: Yes, brought back to MDRS from town. Operation nominal.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: Yes, brought back to MDRS from town. Operation nominal

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: Yes, brought back to MDRS from town.
Operation nominal, however brakes are weak to not working. We will change the brake fluid and bleed the brakes again (3rd time), if this does not work we will need to take it for repairs.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: Yes, brought back to MDRS from town. Operation nominal.

Hours:

Beginning charge:

Ending charge:

Currently charging:

Notes and action taken on rovers: Rovers need their names redone. I’m thinking about painting them instead of using stickers again.

Monthly check and fill of rover batteries (first workday of the month)
Batteries were filled with 20 gallons of distilled water this summer.
They will need to be rechecked soon.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3). Yes, moved to their place by the Outpost for the season. The 300 was in town, and still is, as it will not start. We will need to go to town and tow it back here. One of the 350’s would not start so we need to troubleshoot
that.

Reason for use: see above

Oil Added? No, all were fine.

ATV Fuel Used: 5 Gals

# Hours the ATVs were Used: not recorded

Notes and action taken on ATVs: see above

HabCar running? If used, why, where? Yes, but needed to be jumped when we first got here. Used to haul water.

CrewCar running, If used why, where? Yes, used to transport crew and supplies back and forth to town and Grand Junction. A sensor went out, and one of the volunteers was able to replace it. The check engine light is still on though, as they could not get it to turn off by disconnecting the battery.

Campus wide inspection, if action taken, what and why? Vegetation was removed from around the Hab.

Evidence of rodents, where and action taken: Hab and both trailers showed signs of rodent (packrat) occupation. Two packrats were relocated to Cowboy Corner, one from the intern trailer, the other from the Hab.

Summary of internet: Hab and Astronomy accounts nominal but business account isn’t working. Suspect router damage. There is supposed to be a technician here today (although they were scheduled for last week, so I’m not going to hold my breath).

Summary of suits and radios: Suits were delivered by NorCal on October 25 and they are in beautiful shape. The prototype suit has been fitted with a video camera and will be used for Mars VR work. This gives us 6 two piece suits, which are located on new cabinets in
the EVA room and 4 one piece suits, which are located on the lower deck in the main room. One of the two piece suits has been fitted with a 3D printed neck ring, which is about 1/3 the weight of the traditional neck rings. NorCal is interested in seeing how it holds
up. The two piece suits have also been fitted with new fans, with adjustable air flow. The fans are new in the one piece suits as well, but not adjustable.

Radios were not checked during the work party, but Crew 214 has found them to be in poor shape. Once internet is restored we will get an accounting of them and order what we need.

Summary of Hab operations: The front porch was repaired. The static water tank was cleaned. The wall heater downstairs was removed. The lower deck was refitted with IKEA cabinetry. While not the cubbies for the suits we were hoping for, it fills the lower deck and is
functional. They also gave us a new bench for the bathroom. The painting did not get done before the installation so that will happen during the May work party. The upper deck received a completely new kitchen. The stove was not installed as it was electric. We will go
pick up a new gas stove from IKEA when they get it. The countertop, which is quartz, was measured and ordered and should arrive soon. A new two basin sink was installed on the temporary counter and new plumbing was installed, so both cold and hot water are running and there is no more leak in the drain. The kitchen also has a new microwave and refrigerator and it several feet longer than the old one. In addition, the upper deck has new chairs for the table and two new chairs that replaced the loungers. Unfortunately the two leather
chairs are not functional as loungers so we will be replacing them with some kind of lounger that fits in the new space. We will try to use the old loveseat pieces but the parts for those were disposed of during the refit, so we may not be able to do so. Lights, chargers and
additional mattresses were put into the staterooms. The old blue mattresses were removed. Water heater still needs to be removed and replaced with a new unit. Some new kitchen ware was ordered as some was deemed no longer in good enough condition for use.

Summary of director’s house operations: Nothing to report.

Summary of GreenHab operations: IKEA refitted the GreenHab with some cabinets and a couple of new benches and gave us some planters. The benches need to be coated with a water seal and the cabinets are metal, so care must be taken not to corrode them. I will make up a diagram of the new space soon.

Summary of ScienceDome operations: Nothing was done in the ScienceDome. We attempted to put in the center island, but parts were missing (it was nice to know that even IKEA can have missing parts!) so this refit is on hold until the May work party. A new heating/ac
units was mounted on the power wall over the summer, but is still not fully operational. It was installed to cool the batteries in summer, but can also be used as a heater if needed.

Summary of RAM operations: Nothing to report. David is working on a plan to fix the low amp breakers than trip with the rovers.

Summary of any observatory issues: Nothing to report. Peter needed David and Atila’s help to calibrate the focus on the robotic scope but all is well now.

Summary of health and safety issues: Fire extinguishers need their annual inspection

List and summary of projects: see above. Also, the new intern trailer was moved into a space next to mine in August. We are working to get all systems functional on the trailer before the bad weather hits. Water system has required small repairs and the propane will be
installed this Thursday. The best thing about this trailer (other than it is a four season trailer) is that its solar system also has an inverter so it is currently operating under it’s own generated power. This was a surprise for me as my solar only operates the 12V system
and not the 110 power. I may have to move! Just kidding.

Questions, concerns, supplies needed and requests: We need some general replacement supplies and I will be ordering them soon. We currently have the flatbed trailer loaded with materials needing to go to the dump. I will need to find a way to get it there.

Operations Report Nov 3rd

Crew 214 Operations Report 3-11-2019

SOL: 7

Name of person filing report: Andrew Wheeler

Non-nominal systems: Opportunity, Suit 10

Notes on non-nominal systems: Opportunity brakes do not work, Suit 10 is not charging, Suit 5 helmet is coming apart

Generator: run

Hours run: 11h 40m

From what time last night: 1900

To what time this morning: 0740

List any additional daytime hours when the generator was run: N/A

Solar— SOC % (Before generator is run at night): 94%

Diesel Reading – 65%

Station Propane Reading – 83%

Ethanol Free Gasoline: N/A

Water (loft tank): 47 gallons

Water Meter: 1455453 units

Water (static tank): 246 gallons

Static to Loft Pump used – yes

Water in Green Hab: 225 gallons

Water in Science Dome: 0 gallons

Toilet tank emptied: no

Deimos rover used: not at hab

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Spirit rover used: no

Hours: (before EVA): 107.0

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): 100%

Currently charging: yes

Opportunity rover used: no

Hours: 65.5

Beginning charge: 100%

Ending charge: 100%

Currently charging: yes

Curiosity rover used: no

Hours: 113.4

Beginning charge: (Before EVA) : 100%

Ending charge: (On return from EVA, before charging): 100%

Currently charging: yes

Notes on rovers: no

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3): no

Reason for use: N/A

Oil Added? no

ATV Fuel Used: 0 Gals

# Hours the ATVs were used today: 0

Notes on ATVs: Assigned to the director

HabCar used and why, where? N/A

CrewCar used and why, where? N/A

General notes and comments: N/A

Summary of internet: Functional

Summary of suits and radios: 4 radios not functional, Suit 10 not charging, need 6 extra batteries, Suit 5 helmet is coming apart

Summary of Hab operations: All systems nominal

Summary of GreenHab operations: Watering and fertilization of the soil commenced and 14 plants were planted.

Summary of ScienceDome operations: All systems nominal.

Summary of RAM operations: Not used

Summary of any observatory issues: N/A

Summary of health and safety issues: All crew healthy

Questions, concerns and requests to Mission Support: Still need batteries for 6 radios, suit 5 helmet needs minor fix.

Operations Report – November 2nd

Crew 214 Operations Report 02-11-2019

SOL: 6

Name of person filing report: David Mateus

Non-nominal systems: Opportunity, suit 10

Notes on non-nominal systems: Oppy brakes do not work, Suit 10 is not charging

Generator: run

Hours run: 14:30

From what time last night: 18:30

To what time this morning: 09:00

List any additional daytime hours when the generator was run: none

Solar— SOC % (Before generator is run at night): 91%

Diesel Reading –70%

Station Propane Reading – 83 %

Ethanol Free Gasoline – N/A

Water (loft tank): 50 gallons

Water Meter: 1455280 units

Water (static tank) – 263 gallons

Static to Loft Pump used – Yes

Water in GreenHab – 150 gallons

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Deimos rover used: It is not in the hab

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: No

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Spirit rover used: No

Hours: (before EVA): 106.6 h

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging):100%

Currently charging: Yes

Opportunity rover used: No

Hours: 65.5 h

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: Yes

Hours: 113,4

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging):65%

Currently charging: Yes

Notes on rovers: No

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) No

Reason for use: None

Oil Added? No

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used today: 0

Notes on ATVs: Assigned to the director

HabCar used and why, where? Used by assistant directors to go to town

CrewCar used and why, where? No used

General notes and comments: None

Summary of internet: functional

Summary of suits and radios: Helmet 5 needs minor fix.

Summary of Hab operations: All systems are nominal

Summary of GreenHab operations: No used

Summary of ScienceDome operations: All systems are nominal

Summary of RAM operations: No used

Summary of any observatory issues: No used

Summary of health and safety issues: All the crew are healthy

Questions, concerns and requests to Mission Support:

Copyright © The Mars Society. All rights reserved. | Main Site