Supplemental Operations Report 08Nov2025

[title Supplemental Operations Report – November 8th]

Date: 11/8/2025
Name of person filing report: Anderson Wilder
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. HAB outer shell,

Power system:
1) 200 hr maintenance (including oil, oil filter, and air filter change) expected on 11/12.
2) Current generator hours – 168.

Propane Readings:
Station Tank: 85%
Director Tank: 72%
Intern Tank: 72%
Generator Tank: 38%
Propane refill scheduled for Monday 11/10

Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 450 gallons
Septic Tanks emptied: Yes on 10/20/2025

Rovers:
Sojourner rover used: No
Hours: 221.0
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pick up.
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.
EVA suits and radios:
Suits: Nominal.
Comms: Nominal.
T-Echo EVA-link: Nominal.

Campus:Nominal.
Summary of Hab Operations: Nominal.
Summary of GreenHab Operations: Nominal.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Nominal.
Summary of RAM Operations: Cleaned. Nominal.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

Operations Report – <date – November 9th>

Report title: Operations Report
Crew #: 322
Position: Engineer
Report prepared by: Alessandro Balossino
Date: 09-11-2025
Sol:0

Non-nominal systems: None
Notes on non-nominal systems: N/A

ROVERS
Spirit rover used:
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

Opportunity rover used:
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

Curiosity rover used:
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

Perseverance rover used:
Hours: N/A
Beginning charge: N/A
Ending charge: N/A
Currently charging: N/A

General notes on rovers: used all rovers for a short drive as part of the crew’s training. All nominal.

Summary of Hab operations:
Water Use (see notes): 87.5%*
Main tank level (remaining gallons, see notes): 364*
Main water tank pipe heater (ON or OFF): ON
Main water tank heater (ON or OFF): ON
Toilet tank emptied (NO or YES): NO

*The actual level is higher, since the tank is filled to the top.

Summary of internet: all nominal
Summary of suits and radios: all nominal

Summary of GreenHab operations: (use information from the GreenHab report)
Water use: 0 gallons (160 gallons – 100%)
Heater (ON or OFF): ON
Supplemental light (hours of operation): 0
Harvest (name, weight in grams): 0

Summary of ScienceDome operations: N/A
Dual split (Heat or AC, On or Off or Automatic): N/A

Summary of RAM operations: None
Summary of any observatory issues: None
Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: None

Operations Report – <date – November 10th>

Report title: Operations Report
Crew #: 322
Position: Engineer
Report prepared by: Alessandro Balossino
Date: 10-11-2025
Sol:1

Non-nominal systems: None
Notes on non-nominal systems: None

ROVERS

Spirit rover used:
Hours: 287h
Beginning charge: 100%
Ending charge: 72%
Currently charging: Yes

Opportunity rover used:
Hours: 230.5h
Beginning charge: 100%
Ending charge: 67%
Currently charging: Yes

Curiosity rover used:
Hours: 328.8h
Beginning charge: 100%
Ending charge: 58%
Currently charging: Yes

Perseverance rover used:
Hours: 367.1h
Beginning charge: 100%
Ending charge: 90%
Currently charging: Yes

General notes on rovers: Everything nominal

Summary of Hab operations:
Water Use (see notes): 70 gallons
Main tank level (remaining gallons, see notes): 364
Main water tank pipe heater (ON or OFF): ON
Main water tank heater (ON or OFF): ON
Toilet tank emptied (NO or YES): NO

Summary of internet: all nominal
Summary of suits and radios: all nominal.

Summary of GreenHab operations: (use information from the GreenHab report)
Water use: <1 gallon (160 gallons – 99,8%)
Heater (ON or OFF): ON
Supplemental light (hours of operation): 0
Harvest (name, weight in grams): 0

Summary of ScienceDome operations: N/A
Dual split (Heat or AC, On or Off or Automatic): Automatic

Summary of RAM operations: None
Summary of any observatory issues: None
Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: None

Supplemental Operations Report 15Nov2025

[title Supplemental Operations Report – November 15th]

Date: 11/15/2025
Name of person filing report: Anderson Wilder
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. HAB outer shell,

Power system:
1) 200 hr maintenance (including oil, oil filter, and air filter change) next expected on 11/22.
2) Current generator hours – 320.

Propane Readings:
Station Tank: 80%
Director Tank: 64%
Intern Tank: 69%
Generator Tank: 54%

Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 450 gallons
Septic Tanks emptied: Yes on 10/20/2025

Rovers:
Sojourner rover used: No
Hours: 221.7
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction/Moab for crew pick up/supplies.
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.
EVA suits and radios:
Suits: Nominal.
Comms: Nominal, headsets seem to be having some issues. 4 of them currently tested and working completely, 1 for sure seems faulty, 2 seem intermittent
T-Echo EVA-link: Nominal.

Campus:Nominal.
Summary of Hab Operations: Nominal.
Summary of GreenHab Operations: Nominal.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Robotic observatory failing to open. Motors are turning on, but there’s no movement. Working with Peter on next steps.
Summary of RAM Operations: Cleaned. Nominal.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

Supplemental Operations Report 22Nov2025

[title Supplemental Operations Report – November 22nd]

Date: 11/22/2025
Name of person filing report: Anderson Wilder
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. HAB outer shell,

Power system:
1) 200 hr maintenance (including oil, oil filter, and air filter change) next expected on 11/23.
2) Current generator hours – 425.

Propane Readings:
Station Tank: 80%
Director Tank: 61%
Intern Tank: 63%
Generator Tank: 78%

Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 450 gallons
Septic Tanks emptied: Yes on 10/20/2025

Rovers:
Sojourner rover used: Yes (training)
Hours: 221.7
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pick up/supplies.
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.
EVA suits and radios:
Suits: Nominal.
Comms: Nominal.
T-Echo EVA-link: Nominal.

Campus:Nominal.
Summary of Hab Operations: Nominal.
Summary of GreenHab Operations: Nominal.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Robotic observatory failing to open. Motors are turning on, but there’s no movement. Working with Peter on next steps.
Summary of RAM Operations: Cleaned. Nominal.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

Supplemental Operations Report 29Nov2025

[title Supplemental Operations Report – November 29th]

Date: 11/29/2025
Name of person filing report: Anderson Wilder
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. Hab outer shell. Spirit Rover

Power system:
1) 200 hr maintenance (including oil, oil filter, and air filter change) performed on 11/23 at 441 hrs on clock
2) Current generator hours – 562.

Propane Readings:
Station Tank: 72%
Director Tank: 49%
Intern Tank: 59%
Generator Tank: 40%
Propane (generator) scheduled for Tuesday 12/2

Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 450 gallons
Septic Tanks emptied: Yes on 10/20/2025

Rovers:
Sojourner rover used: Yes (training)
Hours: 221.9
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes

Spirit Rover has a contactor issue so will not run, diagnosis in progress

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pickup/drop off
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.
EVA suits and radios:
Suits: Nominal.
Comms: Nominal.
T-Echo EVA-link: Nominal.

Campus:Nominal.
Summary of Hab Operations: Nominal.
Summary of GreenHab Operations: Nominal.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Nominal.
Summary of RAM Operations: Cleaned. Nominal.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

Supplemental Operations Report – December 6th

Date: 10/25/2025
Name of person filing report: Ben Stanley
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. Hab outer shell. Missing EVA Comms harness. Hab toilet valve.

Power system:
1) 200 hr maintenance (including oil, oil filter, and air filter change) performed on 11/23 at 660 hrs on clock
2) Current generator hours – 699.4.

Propane Readings:
Station Tank: 72%
Director Tank: 82%
Intern Tank: 80%
Generator Tank: 68%
Propane refilled on Tuesday 12/2

Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 500 gallons
Septic Tanks emptied: No

Rovers:
Sojourner rover used: No
Hours: 221.9
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes
Spirit Rover has a contactor issue so will not run, diagnosis in progress

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pickup/drop off
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.

EVA suits and radios:
Suits: Nominal.
Comms: One EVA comms kit is missing the chest harness. Following up with previous crew to attempt to locate it.
T-Echo EVA-link: Nominal

Campus wide inspection, if action taken, what and why: Nominal.
Summary of Hab Operations: Toilet valve failure is causing the toilet bowl to keep filling and overflow. Repairs scheduled for 12/13.
Summary of GreenHab Operations: Nominal.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Robotic observatory failing to open. Motors are turning on, but there’s no movement. Working with Peter on next steps.
Summary of RAM Operations: Environmental sensor failed. Replaced battery and operating normally again.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

Supplemental Operations Report – December 13th

Date: 12/13/2025
Name of person filing report: Ben Stanley
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. Hab outer shell. Robotic observatory. Greenhab environmental sensor.

Power system:
Plan to overhaul inverter/battery system approved. Scheduled for January 2026.
1) 200 hr maintenance (including oil, oil filter, and air filter change) expected on 12/17/2025
2) Current generator hours – 822.1

Propane Readings:
Station Tank: 75%
Director Tank: 75%
Intern Tank: 73%
Generator Tank: 38%
Propane scheduled for 12/16

Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 440 gallons
Septic Tanks emptied: No

Rovers:
Sojourner rover used: No
Hours: 221.9
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes
Spirit Rover has a contactor issue so will not run, diagnosis in progress

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pickup/drop off
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.

EVA suits and radios:
Suits: Nominal.
Comms: Unable to locate missing chest harness. UC Boulder crew purchasing replacement.
T-Echo EVA-link: Nominal

Campus wide inspection, if action taken, what and why: Nominal.
Summary of Hab Operations: Toilet valve repair completed 12/14.
Summary of GreenHab Operations: Environmental sensor failed. Unable to reconnect following battery replacement. Planning to replace sensor.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Robotic observatory failing to open. Motors are turning on, but there’s no movement. Planning to fix with help of Cesare and crew.
Summary of RAM Operations: Nominal.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

Operations Report – December 20th

Report title: Operations Report
Crew #: 325
Position: Engineer
Report prepared by: Morgan McCoy
Date: 20Dec2025
Sol: 5

Non-nominal systems:
Toilet Tank Level Sensor
Notes on non-nominal systems:
Toilet Tank level sensor has shown 2/3 full for ~2 days, despite being emptied yesterday
ROVERS
Curiosity rover used: EVA #6 Ellenah Del Rio & Addriana Waterford
Hours: 339.0
Beginning charge: 100%
Ending charge: 44%
Currently charging: NO
Perseverance rover used: EVA#6 Morgan McCoy
Hours: 386.3
Beginning charge: 100%
Ending charge: 57%
Currently charging: NO
General notes on rovers:
N/A
Summary of Hab operations:
Water Use: At 5PM measured 17 inches in water – 39.1 gallons used
Main tank level: 301.8 gallons calculated with spreadsheet
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: NO
Summary of internet:
Nominal
Summary of suits and radios:
EVA #6 – Suit 8 – Morgan McCoy – Start 12.8 Volts End 12.6 Volts
EVA #6 – Suit 9 – Ellenah Del Rio – Start 13.5 Volts End 12.7 Volts
EVA #6 – Suit 10 – Addriana Waterford – Start 13.7 Volts End 12.5 Volts
Summary of GreenHab operations:
Adrianna Waterford monitored hydroponics system and harvested Basil for Pizza
Water use: 1 gallons
Heater: On
Supplemental light: 0 hrs
Harvest: Basil, 10 grams
Summary of ScienceDome operations:
Checks on running experiments by Saranya Ravva, Adrianna Waterford, Isabella Levine
Dual split: HEAT
Summary of RAM operations: N/A
Summary of any observatory issues: N/A
Summary of health and safety issues: N/A
Questions, concerns and requests to Mission Support:
Salt forcooking

Operations Report – December 21st

Report title: Operations Report
Crew #: 325
Position: Crew Engineer
Report prepared by: Morgan McCoy
Date: 21Dec2025
Sol: 6

Non-nominal systems: N/A
Notes on non-nominal systems: N/A
ROVERS
Curiosity rover used: EVA#7 Isabella Levine & Addriana Waterford
Hours:339.6
Beginning charge: 100%
Ending charge:38%
Currently charging: NO
Perseverance rover used: EVA#7 Saranya Ravva
Hours:387.0
Beginning charge:100%
Ending charge:56%
Currently charging: NO
General notes on rovers:
Nominal
Summary of Hab operations:
Water Use (see notes): At 5 PM: 19.13 gal/day
Main tank level (remaining gallons, see notes): At 5 PM: 189 gallons
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: NO
Summary of internet:
Nominal
Summary of suits and radios:
EVA#7- Suit 8 – Saranya Ravva – Start 13.7 Volt, End 12.9 Volt
EVA#7- Suit 9 – Isabella Levine – 13.8 Volt, End 12.8 Volt
EVA#7- Suit 10 – Addriana Waterford – Start 12.7 Volt, End 12.2 Volt
Radio headsets not working, on desk
Headkit #1, Recieves, does not send
Headset #3, nothing working
Headset #5, snapped headband
Summary of GreenHab operations:
Adrianna Waterford: More microgreens planted and crop beds have been revived from the previous crew.
Water use: 0.25 gallons
Heater: ON
Supplemental light: 0 hours
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations: Checks on running experiments by Saranya Ravva, Adrianna Waterford, Isabella Levine
Dual split: Heat
Summary of RAM operations: Picked up salt
Summary of any observatory issues: N/A
Summary of health and safety issues: N/A
Questions, concerns and requests to Mission Support: N/A