Report title: Operations Report
Crew #: 333
Position: Executive Officer / Crew Engineer
Report prepared by: Antoine Dubois
Date: 02-04-2026
Sol: 4
Non-nominal systems: Pressurised tunnels & suit charger, Comms kit #4
Notes on non-nominal systems:
-
Pressurised tunnels: We repaired the pressurised tunnel using 10 zip ties due to the high winds.
-
Suit charger: We hadn’t noticed, but one of the chargers was broken (probably before we arrived) (See pictures below). We replaced it with a new one. Could we fix it with glue? Is that possible, or is it unsafe?
-
All the joints of the comms kit #4 headset were resoldered. The problem has been solved.
ROVERS
Spirit rover used: EVA #6
Hours: 301.7
Beginning charge: 100%
Ending charge: 38%
Currently charging: Yes
Opportunity rover used: No
Hours: /
Beginning charge: /
Ending charge: /
Currently charging: No
Curiosity rover used: No
Hours: /
Beginning charge: /
Ending charge: /
Currently charging: No
Perseverance rover used: EVA #6
Hours: 402.6
Beginning charge: 100%
Ending charge: 26%
Currently charging: Yes
General notes on rovers: None
Summary of Hab operations:
Water Use: 13.57 gallons
Main tank level: 287 gallons
Main water tank pipe heater (ON or OFF): OFF
Main water tank heater (ON or OFF): YES
Toilet tank emptied (NO or YES): NO
Summary of internet: Connection used for research, listening to music, sending reports and watching Night at the Museum 2.
Summary of suits and radios:
-
Matthias De Groote, Greenhab Officer: Suits and radio 5
-
Marie, Commander: Suits and radio 1
-
Antoine, Executive officer: Suits and radio 2 (headset 3)
Summary of GreenHab operations:
Water use: 2.65 gallons
Heater (ON or OFF): ON, 70 F°
Supplemental light (hours of operation): 7:30 pm to 11:30 pm
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations: We used Science Dome for Joanna’s experiment with Tap Strap.
Dual split (Heat or AC, On or Off or Automatic): AC, Automatic
Summary of RAM operations: Usage of solder material for preparation of comms kit #4, also the multimeter and some pliers were used.
Summary of any observatory issues: None
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support:
-
Suit charger: Could we fix it with glue? Is that possible, or is it unsafe?
-
Trash is in the RAM

