Report title: Operations Report
Crew #: 335
Position: Engineer
Report prepared by: Katherine Berry
Date: 22Apr2026
Sol: 3
Non-nominal systems: None
Notes on non-nominal systems: None
ROVERS
Spirit rover used:
Hours: 0
Beginning charge: N/A
Ending charge: N/A
Currently charging: Yes
Opportunity rover:
Hours: 0
Beginning charge: N/A
Ending charge: N/A
Currently charging: Yes
Curiosity rover used:
Hours: 0
Beginning charge: N/A
Ending charge: N/A
Currently charging: Yes
Perseverance rover used:
Hours: 0
Beginning charge: N/A
Ending charge: N/A
Currently charging: Yes
General notes on rovers: None
Summary of Hab operations:
Water Use (see notes): 33.35 gal/d
Main tank level (remaining gallons, see notes): 245 gal
Main water tank pipe heater (ON or OFF): OFF
Main water tank heater (ON or OFF) OFF (was removed)
Toilet tank emptied (NO or YES): NO
Summary of internet: Connection was used for research, accessing, and working on homework, sending reports and listening to music.
Summary of suits and radios: None.
Summary of GreenHab operations: (use information from the GreenHab report)
Water use: 1.6 gallons
Heater (ON or OFF): Auto
Supplemental light (hours of operation): Auto
Harvest (name, weight in grams): 0g
Summary of ScienceDome operations: Used to film creative projects.
Dual split (Heat or AC, On or Off or Automatic): Automatic
Summary of RAM operations: (Tools used, work done) Used 8 zip ties to secure the tarp over the walkways. Utilized a hammer and pliers to adjust and flatten a metal piece that was catching on the door, allowing it to close properly. Employed a crowbar to carefully realign and free a door that had been blown out of position and stuck due to strong winds.
Summary of any observatory issues: N/A
Summary of health and safety issues: Crewmates are feeling better today. Taking acetaminophen as needed for headache.
Questions, concerns and requests to Mission Support: None

