Operations Report – November 1st

Crew 214 Operations Report 01-11-2019

SOL: 5

Name of person filing report: David Mateus

Non-nominal systems: Opportunity, suit 10

Notes on non-nominal systems: Oppy brakes do not work, Suit 10 is not charging

Generator: run

Hours run: 14

From what time last night: 17:30

To what time this morning: 7:30

List any additional daytime hours when the generator was run: none

Solar— SOC % (Before generator is run at night): 71%

Diesel Reading –71 %

Station Propane Reading – 85 %

Ethanol Free Gasoline – N/A

Water (loft tank): 17 gallons

Water Meter: 1455145 units

Water (static tank) – 301 gallons

Static to Loft Pump used – No

Water in GreenHab – 150 gallons

Water in ScienceDome: 0 gallons

Toilet tank emptied: yes

Deimos rover used: It is not in the hab

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: No

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Spirit rover used: tes

Hours: (before EVA): 106.6 h

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging):50%

Currently charging: Yes

Opportunity rover used: No

Hours: 65.5 h

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: No

Hours: 112.5

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging):100%

Currently charging: Yes

Notes on rovers: No

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) No

Reason for use: None

Oil Added? No

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used today: 0

Notes on ATVs: Assigned to the director

HabCar used and why, where? Used by assistant director to go to town

CrewCar used and why, where? No used

General notes and comments: None

Summary of internet: functional

Summary of suits and radios: used for EVA, Suit 10 is not charging and we need batteries for 6 radios

Summary of Hab operations: All systems are nominal

Summary of GreenHab operations: No used

Summary of ScienceDome operations: All systems are nominal

Summary of RAM operations: No used

Summary of any observatory issues: No used

Summary of health and safety issues: All the crew are healthy

Questions, concerns and requests to Mission Support: We need new batteries for six radios.

Operations Report – Oct 31st

Crew 214 Operations Report 31-Oct-2019

SOL: 4

Name of person filing report: David Mateus

Non-nominal systems: Opportunity, suit 10, generator

Notes on non-nominal systems: Oppy brakes do not work, Suit 10 is not charging and the generator stopped working in the night

Generator: run, Stopped running in the night

Hours run: N/A

From what time last night: 17:00

To what time this morning: 7:30

List any additional daytime hours when the generator was run: none

Solar— SOC % (Before generator is run at night): 77%

Diesel Reading –72 %

Station Propane Reading – 85 %

Ethanol Free Gasoline – N/A

Water (loft tank): 30 gallons

Water Meter: 1454950 units

Water (static tank) – 301 gallons

Static to Loft Pump used – No

Water in GreenHab – 150 gallons

Water in ScienceDome: 0 gallons

Toilet tank emptied: no

Deimos rover used: It is not in the hab

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: No

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours: –

Beginning charge: –

Ending charge: –

Currently charging: –

Spirit rover used: No

Hours: (before EVA): 106.1 h

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging):100%

Currently charging: Yes

Opportunity rover used: No

Hours: 65.5 h

Beginning charge: 100%

Ending charge: 100%

Currently charging: Yes

Curiosity rover used: Yes

Hours: 112.5

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging):52%

Currently charging: Yes

Notes on rovers: No

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) No

Reason for use: None

Oil Added? No

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used today: 0

Notes on ATVs: Assigned to the director

HabCar used and why, where? Used by assistant director to go to town

CrewCar used and why, where? No used

General notes and comments: None

Summary of internet: functional

Summary of suits and radios: used for EVA, Suit 10 is not charging and we need batteries for 6 radios

Summary of Hab operations: All systems are nominal

Summary of GreenHab operations: No used

Summary of ScienceDome operations: All systems are nominal

Summary of RAM operations: No used

Summary of any observatory issues: No used

Summary of health and safety issues: All the crew are healthy

Questions, concerns, and requests to Mission Support: We need new batteries for six radios.

Operations Report – October 30th

Crew 214 Operations Report 30-10-2019
SOL: 3
Name of person filing report: David Mateus
Non-nominal systems: Opportunity, suit 10
Notes on non-nominal systems: Oppy brakes do not work and Suit 10 is not charging
Generator: run
Hours run: 14:00
From what time last night: 17:30
To what time this morning: 7:30
List any additional daytime hours when the generator was run: none
Solar— SOC % (Before generator is run at night): 80%
Diesel Reading –73 %
Station Propane Reading – 86 %
Ethanol Free Gasoline – N/A
Water (loft tank): 40 gallons
Water Meter: 1454844 units
Water (static tank) – 301 gallons
Static to Loft Pump used – Yes
Water in GreenHab – 150 gallons
Water in ScienceDome: 0 gallons
Toilet tank emptied: no
Deimos rover used: It is not in the hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: No
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Spirit rover used: Yes
Hours: (before EVA): 106.1 h
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging):47%
Currently charging: Yes
Opportunity rover used: No
Hours: 65.5 h
Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes
Curiosity rover used: Yes
Hours: 112
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging):59%
Currently charging: Yes
Notes on rovers: No
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) No
Reason for use: None
Oil Added? No
ATV Fuel Used: 0 Gals
# Hours the ATVs were Used today: 0
Notes on ATVs: Assigned to the director
HabCar used and why, where? Used by assistant director to go to town
CrewCar used and why, where? No used
General notes and comments: None
Summary of internet: functional
Summary of suits and radios: used for EVA, Suit 10 is not charging and we need batteries for 6 radios
Summary of Hab operations: All systems are nominal
Summary of GreenHab operations: No used
Summary of ScienceDome operations: All systems are nominal, used for experiment preparations
Summary of RAM operations: No used
Summary of any observatory issues: No used
Summary of health and safety issues: All the crew are healthy
Questions, concerns and requests to Mission Support: We need new batteries for six radios.

Operations Report – October 29th

Crew 214 Operations Report 29-10-2019
SOL: 2
Name of person filing report: David Mateus
Non-nominal systems: Opportunity, suit 10
Notes on non-nominal systems: Oppy brakes do not work and Suit 10 is not charging
Generator: run
Hours run: 14:24
From what time last night: 18:04
To what time this morning: 8:00
List any additional daytime hours when the generator was run: none Solar— SOC % (Before generator is run at night): 81%
Diesel Reading –75 %
Station Propane Reading – 88 %
Ethanol Free Gasoline – N/A
Water (loft tank): 44 gallons
Water Meter: 1454520 units
Water (static tank) – 323 gallons
Static to Loft Pump used – Yes
Water in GreenHab – 150 gallons
Water in ScienceDome: 0 gallons
Toilet tank emptied: yes
Deimos rover used: It is not in the hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: No
Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –
Spirit rover used: Yes
Hours: (before EVA): 105.5 h
Beginning charge: (Before EVA1): 100%
Ending charge: (On return from EVA1, before recharging):71%
Beginning charge: (Before EVA2): 98%
Ending charge: (On return from EVA1, before recharging):81%
Currently charging: Yes
Opportunity rover used: No
Hours: 65.5 h
Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes
Curiosity rover used: Yes
Hours: 111.5
Beginning charge: (Before EVA1): 100%
Ending charge: (On return from EVA1, before recharging):81%
Beginning charge: (Before EVA2): 99%
Ending charge: (On return from EVA1, before recharging):88%
Currently charging: Yes
Notes on rovers: No
ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) No
Reason for use: None
Oil Added? No
ATV Fuel Used: 0 Gals
# Hours the ATVs were Used today: 0
Notes on ATVs: Assigned to the director
HabCar used and why, where? Used by assistant director to go to town for water CrewCar used and why, where? Not used
General notes and comments: None
Summary of internet: functional
Summary of suits and radios: Not used
Summary of Hab operations: All systems are nominal
Summary of GreenHab operations: Not used
Summary of ScienceDome operations: All systems are nominal, used for experiment preparations
Summary of RAM operations: Not used
Summary of any observatory issues: Not used
Summary of health and safety issues: All the crew are healthy Questions, concerns and requests to Mission Support: We need new batteries for six radios.

Operations Report – October 28th

Name of person filing report: David Mateus
Non-nominal systems: Opportunity
Notes on non-nominal systems: Its brakes do not work
Generator: run
Hours run: 8.5
From what time last night: 18:00
To what time this morning: 2:30
List any additional daytime hours when the generator was run: none
Solar— SOC % (Before generator is run at night): 84%
Diesel Reading –75 %
Station Propane Reading – 88 %
Ethanol Free Gasoline – N/A
Water (loft tank): 47 gallons
Water Meter: 1454197 units
Water (static tank) – 350 gallons
Static to Loft Pump used – Yes
Water in GreenHab – 0 gallons
Water in ScienceDome: 0 gallons
Toilet tank emptied: yes

Deimos rover used: It is not in the hab
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: No

Sojourner rover used: ASSIGNED TO DIRECTOR
Hours: –
Beginning charge: –
Ending charge: –
Currently charging: –

Spirit rover used: No
Hours: (before EVA): 105.5 h
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging):100%
Currently charging: Yes

Opportunity rover used: No
Hours: 65.5 h
Beginning charge: 100%
Ending charge: 100%
Currently charging: Yes

Curiosity rover used: No
Hours: 111.5
Beginning charge: 100%
Ending charge:100%
Currently charging: Yes

Notes on rovers: No

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3) No
Reason for use: None
Oil Added? No
ATV Fuel Used: 0 Gals
# Hours the ATVs were Used today: 0
Notes on ATVs: Assigned to the director

HabCar used and why, where? Used by assistant directors to go to town

CrewCar used and why, where? Used to go to Grand Junction

General notes and comments: None
Summary of internet: functional
Summary of suits and radios: No used
Summary of Hab operations: All systems are nominal
Summary of GreenHab operations: No used
Summary of ScienceDome operations: All systems are nominal, used for experiment preparations
Summary of RAM operations: No used
Summary of any observatory issues: Re-centered the focuser by the assistant directors
Summary of health and safety issues: All the crew are healthy
Questions, concerns and requests to Mission Support: We need new batteries for six radios.

Operations Report – Sept 4th

Off season  Operations Report 4 Sept 2019

SOL: n/a

Name of person filing report: Shannon Rupert

Non-nominal systems: Hab water filter is black

Notes on non-nominal systems:  the water filter is black. I don’t know that replacing it now would do anything so we will need to clean the system before any use in Oct.

Generator (hours run): not run

Generator SOC currently 89% at 6 pm

Diesel Reading – 71%

Propane Reading – Shannon’s  20%.  Main tank 41 %

Ethanol Free Gasoline – 8 gallons.

Water (Axillary tank)  – 0 gallons

Water (static tank) – 400 gallons. 150 gallons at Shannon’s

Axillary to Static tank transfer– no

Gallons transferred: none

Water in GreenHab – n/a gallons

Water (loft) – Static to Loft Pump used – no

Water Meter: n/a

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used:  in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Notes on rovers: all working rovers in town being used and well cared for.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3)

No

Oil Added? No

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used today: zero

Notes on ATVs: nothing to report

HabCar used and why, where? Not used

CrewCar used and why, where? Yes. To town for drinking water.

General notes and comments:  Productive meeting with Ikea (SLC).  We worked on changes to the plans provided by Ikea in Sweden to improve function over form. The plan is to do the upgrades in three stages: lower deck and GreenHab first to be completed during the October work party. A new kitchen and science lab will be installed later in the season.

Summary of internet: nothing to report

Summary of suits and radios: nothing to report

Summary of Hab operations: nothing to report

Summary of GreenHab operations: Nothing to report.

Summary of ScienceDome: Dual split unit was installed in the interior but need the pad for the outside unit which did not get ordered. Once that is herewe will contact an Hvac company to add the refrigerant and then the Science Dome will have both ac and heat. This was installed mainly so we can keep the power system cool in the summer as the dome is pretty well insulated.

Summary of RAM operations: nothing to report

Summary of any observatory issues: Nothing to report

Summary of health and safety issues: continues to be unseasonably warm. I either have a cold or allergies.

Questions, concerns and requests to Mission Support:

Correction from last night’s report: power lost on June 27th, not July.

Operations Report – Sept 3rd

Off season  Operations Report 3 Sept 2019

SOL: n/a

Name of person filing report: Shannon Rupert

Non-nominal systems: two GreenHab breakers (new problem), on ENG breaker ( known problem, new reaction)

Notes on non-nominal systems: the power system failed on July 27th (based on data from my Dish Hopper). Three breakers in the Hab tripped as noted above and the short caused a stack mode fault that shut down the system. We got the Science Dome power on first by turning off all the breakers in the Hab, the throwing them one at a time. the ENG breaker is the plugs on the outer wall, which have needed replacement but we were waiting for the remodel. Apparently they shorted. The GreenHab issue is a puzzle and we will start by replacing the two breakers with new ones.

Generator (hours run): one hour. Generator has a small diesel leak that will need to be reported when the season starts. Battery needed to be jumped.

Generator SOC currently 85 % at 6 pm with my AC on

Diesel Reading – 71%

Propane Reading – Shannon’s is currently at 20% and will need a refill although we will probably need a new larger one due to the Intern trailer purchase.  Main tank 41 %

Ethanol Free Gasoline – 8 gallons.

Water (Axillary tank)  – 0 gallons

Water (static tank) – 400 gallons, will need cleaning next month, 150 gallons at Shannon’s

Axillary to Static tank transfer– no

Gallons transferred: none

Water in GreenHab – n/a gallons

Water (loft) – Static to Loft Pump used – no

Water Meter: n/a

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used:  in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: in town

Hours:

Beginning charge:

Ending charge:

Currently charging:

Notes on rovers: all working rovers in town being used and well cared for.

ATV’s Used: (Honda, 300, 350.1, 350.2, 350.3)

Reason for use: all were started and run for awhile. The 300 had to be jumped.

Oil Added? No

ATV Fuel Used: 0 Gals

# Hours the ATVs were Used today: one

Notes on ATVs: nothing to report

HabCar used and why, where? Yes. Jumped to start, used to jump generator for start

CrewCar used and why, where? Yes. Using it to travel back and forth to town as the road is too rough for my little rental car.

General notes and comments:  the campus is in decent shape, just has that sad abandoned quality it gets when no one is here. Little evidence of rodents, a few droppings in Hab’s lower deck with none anywhere else. I will have a list of things getting repaired before the work party by the end of the week. We also have a new fifth wheel traler coming on campus for interns and grad students. It’s pretty much a match for mine and will be parked along side mine. Thanks to the donor who supported its purchase, we will have a more active intern program this year.

Summary of internet: all three accounts nominal. We changed the router as it wasn’t working to the old Science one. I don’t have my computer so can’t use mine as the WiFi isn’t turned on. One note of interest:  there is a new cell tower in town and I have some limite text and web capabilities.

Summary of suits and radios: suits are still with NorCal. Radios are in bad shape. Most will need to be replaced

Summary of Hab operations: nothing to report except whoever left the rubber snake has freaked all of us out.

Summary of GreenHab operations: Nothing to report.

Summary of ScienceDome operations: we will start installing the dual split ac/ heat unit in the ScienceDome tomorrow

Summary of RAM operations: nothing to report

Summary of any observatory issues: Peter confirms robotic Observatory is back on line.

Summary of health and safety issues: it’s very hot. With no power last night and 100 degrees in my trailer when I went to bed I slept poorly. Still hot today even with ac.

Questions, concerns and requests to Mission Support:

Tomorrow we will have a visit from two people from SLC Ikea to work on the ongoing redesign project we have with them.

Crew 213 Operations Report 24-May-2019

Crew 213 Operations Report 24-May-2019

SOL: 6

Name of person filing report:Dana Levin

Non-nominal systems: None

Generator (hours run): overnight 2000-0700

Solar— SOC % (Before generator is run at night): 80% (see above)

Diesel Reading – 73%

Propane Reading – 45%

Ethanol Free Gasoline – 4 gallons.

Water (auxillary tank) – 0

Water (static tank) – 400 gallons

Auxillary to Static tank transfer– Yes

Gallons transferred: 100

Water in GreenHab – Greenhab ops have closed for the season, Crew 213 will not be performing greenhab ops

Water (loft) – Static to Loft Pump used – yes

Water Meter: 144250

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: Personal rover of director used with her permission by CU- Staff

Hours: 1 hour

Beginning charge: 100%

Ending charge: 84

Currently charging: yes

Spirit rover used: yes

Hours: 1

Beginning charge: 100

Ending charge: 80

Currently charging: yes

Opportunity rover used: yes

Hours: 1

Beginning charge: 100

Ending charge: 79

Currently charging: yes

Curiosity rover used:

Hours: 1

Beginning charge: 100

Ending charge: 82

Currently charging: yes

Notes on rovers: nothing to report

ATV’s Used: no

Reason for use: N/A

Oil Added? no

ATV Fuel Used: no

# Hours the ATVs were Used today: 0

Notes on ATVs: ATVs are safely secured near directors residence and will not be used by crew 213 for planned nominal operations

HabCar used and why, where? Yes, to obtain water from town.

CrewCar used and why, where? no (in Grand Junction)

General notes and comments:

– Crew 213 had successful simulation of several medical contingencies on EVA today.

Summary of internet: functional

Summary of suits and radios: Suits are all working well. We are using our own radios.

Summary of Hab operations: nominal

Summary of GreenHab operations: none

Summary of ScienceDome operations: Used for course lectures and briefings. All systems nominal

Summary of RAMM operations: none

Summary of any observatory issues: none identified as we are not using observatory

Summary of health and safety issues: None at this time

Questions, concerns and requests to Mission Support: None needed. Thank you so much for your support of our mission.

Operations Report – May 22nd

Crew 213 Operations Report 22-May-2019

SOL: 4

Name of person filing report: Dana Levin

Non-nominal systems: Weather.

Generator (hours run): overnight 2000-0700

Solar— SOC % (Before generator is run at night): 68% (see above)

Diesel Reading – 76%

Propane Reading – 45%

Ethanol Free Gasoline – 4 gallons.

Water (auxillary tank) – 0

Water (static tank) – 400 gallons

Auxillary to Static tank transfer– Yes

Gallons transferred: 100

Water in GreenHab – Greenhab ops have closed for the season, Crew 213 will not be performing greenhab ops

Water (loft) – Static to Loft Pump used – yes

Water Meter: 144100

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: no

Hours: n/a

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: yes

Hours: 2

Beginning charge: 100%

Ending charge: 60%

Currently charging: yes

Opportunity rover used: yes

Hours: 2

Beginning charge: 100%

Ending charge: 56%

Currently charging: yes

Curiosity rover used:

Hours: 2

Beginning charge: 100%

Ending charge: 71%

Currently charging: yes

Notes on rovers: see above about curiosity off switch

ATV’s Used: no

Reason for use: N/A

Oil Added? no

ATV Fuel Used: no

# Hours the ATVs were Used today: 0

Notes on ATVs: ATVs are safely secured near directors residence and will not be used by crew 213 for planned nominal operations

HabCar used and why, where? Yes, to transport supplies for educational purposes during our training this afternoon

CrewCar used and why, where? no (in Grand Junction)

General notes and comments:

– Crew 213 had successful simulation of several medical contingencies on EVA today.

Summary of internet: functional

Summary of suits and radios: Suits are all working well. Crew 212 did a fantastic job of maintaining them. Give our numbers, we are using our own radios.

Summary of Hab operations: nominal

Summary of GreenHab operations: none

Summary of ScienceDome operations: Used for course lectures and briefings. All systems nominal

Summary of RAMM operations: none

Summary of any observatory issues: none identified as we are not using observatory

Summary of health and safety issues: None at this time

Questions, concerns and requests to Mission Support: None needed. Thank you so much for your support of our mission.

Operations Report – May 21st

Crew 213 Operations Report 21-May-2019

SOL: 3

Name of person filing report: Dana Levin

Non-nominal systems: Curiosity on switch is loose to the point where when you turn the key the entire assembly turns with it. If this is not remedied the eventual consequence may be tearing the on switch wire connections from torsional forces.

Generator (hours run): overnight 2000-0700

Solar— SOC % (Before generator is run at night): 70% (see above)

Diesel Reading – 78%

Propane Reading – 45%

Ethanol Free Gasoline – 4 gallons.

Water (auxillary tank) – 0

Water (static tank) – 400 gallons

Auxillary to Static tank transfer– Yes

Gallons transferred: 100

Water in GreenHab – Greenhab ops have closed for the season, Crew 213 will not be performing greenhab ops

Water (loft) – Static to Loft Pump used – yes

Water Meter: 144100

Toilet tank emptied: no

Deimos rover used: no

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: Personal rover of director used with her permission by CU- Staff

Hours: 1 hour

Beginning charge: 100%

Ending charge: 68%

Currently charging: yes

Spirit rover used: yes

Hours: 2

Beginning charge: 60%

Ending charge: 15%

Currently charging: yes

Opportunity rover used: yes

Hours: 2

Beginning charge: 100%

Ending charge: 60%

Currently charging: yes

Curiosity rover used:

Hours: 2

Beginning charge: 100%

Ending charge: 72%

Currently charging: yes

Notes on rovers: see above about curiosity off switch

ATV’s Used: no

Reason for use: N/A

Oil Added? no

ATV Fuel Used: no

# Hours the ATVs were Used today: 0

Notes on ATVs: ATVs are safely secured near directors residence and will not be used by crew 213 for planned nominal operations

HabCar used and why, where? Yes, to obtain water from town.

CrewCar used and why, where? no (in Grand Junction)

General notes and comments:

– Crew 213 had successful simulation of several medical contingencies on EVA today.

Summary of internet: functional

Summary of suits and radios: Suits are all working well. Crew 212 did a fantastic job of maintaining them. Give our numbers, we are using our own radios.

Summary of Hab operations: nominal

Summary of GreenHab operations: none

Summary of ScienceDome operations: Used for course lectures and briefings. All systems nominal

Summary of RAMM operations: none

Summary of any observatory issues: none identified as we are not using observatory

Summary of health and safety issues: None at this time

Questions, concerns and requests to Mission Support: None needed. Thank you so much for your support of our mission.

Copyright © The Mars Society. All rights reserved. | Main Site