| Date: | 11/9/2026 |
| Name of person filing report: | David Steinhour |
| Reason for Report: | Routine |
| Non-Nominal Systems: | |
| Power system: | 1) Power system: Nominal. 2) Current generator hours: 1468.9 |
| Propane Readings: | Generator: 72% Hab tank 71% Director Trailer 49% Intern Trailer 60% |
| Water: | Hab 550 Gallons GreenHab 220 gallons Outpost 400 gallons |
| Rovers: | Batteries serviced 9/24. Spirit:319.5 Opportunity:281.7 Curiousity: 364.9 Perserverance: 421.6 Sojourner: 246.9 |
| Cars: | |
| Summary of Internet: | Nominal. |
| EVA suits and radios: | Nominal. |
| Campus wide inspection, if action taken, what and why: | Nominal. |
| Summary of Hab Operations: | Nominal. |
| Summary of GreenHab Operations: | Nominal. |
| Summary of SciDome Operations: | Science Dome airlock latch fixed. All nominal. |
| Summary of Observatories Operations: | All nominal. |
| Summary of RAM Operations: | All nominal. |
| Summary of Outpost Operations: | All nominal. |
| Summary of Health and Safety Issues: | All nominal. |

