Operations Report – March 1st

Report title: Operations Report

Crew #: 330

Position: Crew Engineer

Report prepared by: Lou Goiffon

Date: 01-03-2026

Sol: 14

Non-nominal systems: The toilet have been dismantled, showing no signs of overflowing. We assembled it again after checking that no smell was persisting with the top of the tank closed. Every thing seems good.

Notes on non-nominal systems: N/A

ROVERS

Spirit rover used: No

Hours:

Beginning charge:

Ending charge:

Currently charging: YES

Opportunity rover used : Yes

Hours (Before EVA): 257.9

Beginning charge: 100%

Ending charge: 86%

Currently charging: YES

Curiosity rover used: Yes

Hours (Before EVA): 348.6

Beginning charge: 100%

Ending charge: 88%

Currently charging: YES

Perseverance rover used: No

Hours (Before EVA):

Beginning charge:

Ending charge:

Currently charging:

General notes on rovers:

Summary of Hab operations:

Water Use (see notes): 37.26 gal/d

Main tank level (remaining gallons, see notes): 370 gallons

Main water tank pipe heater (ON or OFF): ON

Main water tank heater (ON or OFF): ON

Toilet tank emptied (NO or YES): NO

Summary of internet: downlink 356.23 Mbits/s, uplink 23.90 Mbits/s, ping 23 ms

Summary of suits and radios: N/A

Summary of GreenHab operations: (use information from the GreenHab report)

Water use: 2.5 gallons

Heater (ON or OFF): ON

Supplemental light (hours of operation): 6pm – 11:30pm

Harvest (name, weight in grams): 0

Summary of ScienceDome operations: N/A

Dual split (Heat or AC, On or Off or Automatic): ON

Summary of RAM operations: N/A

Summary of any observatory issues: N/A

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: N/A