Operations Report – May 1st

Crew 315 Operations Report 01-05-2025

SOL: 11

Name of person filing report: Michael Andrews

Non-nominal systems: Catalytic Heater

Notes on non-nominal systems:

· (Bonus project) The catalytic heater near the exercise bike in the habitat does not work. It’s an engineering project to see if this can get properly started during this mission. Barring any more impactful repairs needed, this project will be worked tomorrow.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: Yes

Hours: 222.0 hours (0.8 hours used)

Beginning charge: 100%

Ending charge: 40%

Currently charging: No

Curiosity rover used: Yes

Hours: 318.3 hours (0.5 hours used)

Beginning charge: 100%

Ending charge: 67%

Currently charging: Yes

Perseverance rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

General notes on rovers: None

Summary of Hab operations: Team performed 1 EVA, completed the final 100cameras module, watched 2020: The Year We Made Contact, and prepared for tomorrow’s CNBC interview.

Water Use

Time of measurements: 1910
1) Per formula: 29.41 gallons
2) Smart Home Dashboard: 32.0 gallons

Water (static tank, remaining gallons): 170.97 gallons

Static tank pipe heater: Off

Static tank heater: Off

Toilet tank emptied: Yes

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects, and complete professional work.

Summary of suits and radios:

· EVA 20: Suits 9, 10, 11 and Radios 3, 4, 5

Summary of GreenHab operations: Watered plants and Crew Artist began the teardown GreenHab process by placing plants in trash bags.

WATER USE: 4.2 gallons

Heater: On

Supplemental light: Off

Harvest (name, weight in grams): None

Summary of ScienceDome operations: used for Commander’s meeting with CNBC, power source for Starlink Mini, and are for the Crew Artist to sign the back of the 1000-piece puzzle.

Dual split: Off

Summary of RAM operations: No tools used

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: None

Operations Report – May 2nd

Crew 315 Operations Report 02-05-2025

SOL: 12

Name of person filing report: Michael Andrews

Non-nominal systems: Catalytic Heater

Notes on non-nominal systems: I have officially given up on the catalytic heater. I want to make sure I don’t introduce unnecessary gas into the station or accidentally damage the heater. I am deferring repair and troubleshooting to Mission Support.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Curiosity rover used: Yes

Hours: 318.8 hours (0.3 hours used)

Beginning charge: 100%

Ending charge: 89%

Currently charging: No

Perseverance rover used: Yes

Hours: 357.3 hours (0.5 hours used)

Beginning charge: 100%

Ending charge: 81%

Currently charging: No

General notes on rovers: None

Summary of Hab operations: The team had a light breakfast, began to clean the station, welcomed CNBC for a tour and individual interviews, and performed one EVA with the CNBC cameraman.

Water Use

Time of measurements: 1615
1) Per formula: 22.87 gallons
2) Smart Home Dashboard: 29.5 gallons

Water (static tank, remaining gallons): 148.10 gallons

Static tank pipe heater: Off

Static tank heater: Off

Toilet tank emptied: No

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects, and complete professional work.

Summary of suits and radios:

· EVA 21: Suits 7, 8, 9, 11 and Radios 1 ,2, 3, 4

Summary of GreenHab operations: Started to clean up the GreenHab for closeout operations, watered plants and fungal project.

WATER USE: 3.15 gallons

Heater: Off

Supplemental light: Off

Harvest: Preparing the Mission Support plants-to-go

Summary of ScienceDome operations: Started to clean up the Dome and prepare for closeout.

Dual split: Off

Summary of RAM operations: Started to clean up the RAM and prepare for closeout. All outstanding tools from previous projects and EVAs were returned to RAM inventory.

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: Thanks for a great time!

Supplemental Operations Report -May 4th

Date: 5/4/2025
Name of person filing report: David Steinhour
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters, generator. Robotic observatory. HAB outer shell. Spirit. Guest Wifi not turning on.

Power system: "Solar: The battery bank does not hold charge when sun is down and low on the horizon. Inverter Slave 1 and 2 went offline and do not restart, which limits us to 4kW when on solar.
Main generator has been monitored for oil leaks; minor leaks observed, Moreover, generator is consuming oil because of worn piston rings. Adding oil every day is necessary. Generator is limited to 8kW, see previous reports for details. No further leaks have been observed.
1) Oil, oil filter changed on 05/02/2025. Hours: 9484.3
2) Current hours – 9496.6"

Propane Readings: "Refilled 4/24
Station Tank: 79%
Director Tank: 75%
Intern Tank: 85%
Generator Tank: 53%"

Water: "Hab Static Tank – 170 gallons
GreenHab – 0 gallons
Outpost tank – 550 gallons"

Rovers: "Sojourner rover used: no
Hours: 213.4
Beginning Charge: 100 %
Ending Charge: 100 %
Currently Charging: No
Notes on Rovers: Spirit is not charging"

Cars: "Hab Car used and why, where: To Hanksville for supplies.
Crew Car used and why, where: Transporting crew to Grand Junction.
General notes and comments: Crew car driver’s side front ball joint is bad. Low oil pressure is most likely caused by a bad sensor (it does not change due to RPM or temperature like it should)."

Summary of Internet: Guest WiFi is not turning on despite all attempts, and most likely needs a firmware reset.
EVA suits and radios: "Suits: Nominal.
Comms: Headset #3 push-to-talk button nonfunctional.
T-Echo EVA-link: Nominal"
Campus wide inspection, if action taken, what and why: Nominal
Summary of Hab Operations: Small cracks in the wall of the Hab in the loft area are allowing cold air intrusion. Static tank and pipe heaters unplugged. Thermostat setup for 60F due to warm weather.
Summary of GreenHab Operations: Greenhab plants removed for summer temps. New potting soil resupplied.
Summary of SciDome Operations: Dual split is being turned on during day time for cooling.
Summary of Observatories Operations: Robotic observatory offline.
Summary of RAM Operations: Nominal
Summary of Outpost Operations: Nominal
Summary of Health and Safety Issues: Nominal

Operations Report – April 28th

Crew 315 Operations Report 28-04-2025

SOL: 8

Name of person filing report: Michael Andrews

Non-nominal systems: Catalytic Heater, Two Piece Space Suits

Notes on non-nominal systems:

· (Bonus project) The catalytic heater near the exercise bike in the habitat does not work. It’s an engineering project to see if this can get properly started during this mission. Barring any more impactful repairs needed, this project will be worked tomorrow.

· (New Project): Some of the two-piece suits have slight variations in functionality. One of the suit’s battery displays don’t work, and another one has a rather noisy fan. I’d like to focus on these two tomorrow to see if I can fix them like I did with suit #10 today.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Curiosity rover used: Yes

Hours: 316.1 hours (1.3 hours used)

Beginning charge: 100%

Ending charge: 85%

Currently charging: No

Perseverance rover used: Yes

Hours: 354.5 hours (1.3 hours used)

Beginning charge: 100%

Ending charge: 81%

Currently charging: Yes

General notes on rovers: None

Summary of Hab operations: We performed two EVAs today, including one of which was focused on repairing the exterior surfaces of the hab tunnels. We had cereal for breakfast, leftovers for lunch, a frito/pasta/chili concoction for dinner.

Water Use (please use both methods to estimate water usage)

Time of measurements: 1845
1) Per formula: 26.4 gallons
2) Smart Home Dashboard: 24.5 gallons

Water (static tank, remaining gallons): 252.66 gallons

Static tank pipe heater: No

Static tank heater: No

Toilet tank emptied: No

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects, and complete professional work.

Summary of suits and radios:

· EVA 14: Suits 7, 10 and Radios 1, 2

· EVA 15: Suits 7, 8, 9 and Radios 2, 3, 4

Summary of GreenHab operations: Watered plants and fungal projects, harvested chives and tomatoes, started to review the closeout list for GreenHab teardown.

WATER USE: 10 gallons

Heater: Yes

Supplemental light: 1900-2200

Harvest (name, weight in grams): 5g chives, 20g tomatoes

Summary of ScienceDome operations: Scanned an additional rock from Robert’s Rock Garden.

Dual split: Off

Summary of RAM operations:

· Space Suit: I performed a bit of troubleshooting and realized that all suits were functional and nominally charging, except for Suit #10. After opening up all one-piece suits, I realized that Suit #10 had an extra wire to power an embedded EVA Link unit (Astro #10). I removed that unit and unlinked the wire from the circuit, and it still had a weaker powered fan than the other suits. I finally swapped the Suit #10 battery with a fresh one and resolved the issue. All other one-piece suits function similarly. The dead battery was labeled as such and added to the existing dead 12V batteries in the space suit room.

· ScienceDome Radio Charger: I tried many different techniques to repair the charger but had no luck and ultimately returned it to the ScienceDome with a “Broken” tag taped on the front. I disassembled the unit and swapped power cords with functioning chargers and isolated the issue to the circuit board of the charger. I even re-soldered some components that I perceived as loose with no success. All work was done in the RAM, so no tools were removed.

· Showerhead Leak: After investigating the leaks, it was discovered that the three threaded ports were leaking. Plumber’s tape on each thread – along with cleaning the most upstream seal – removed all leaking. This will be a minor reduction in water consumption for the rest of the mission. A good amount of plumber’s tape was removed, and the roll was returned to the RAM afterwards.

· Golf Club: Crew Artist Gagnon has requested a 9-iron golf club to recreate a famous Apollo photo of golfing on the moon. I was able to craft a club out of a broom handle, a wall hook, and duct tape – although it does look more like a putter to me. I will return all these components to their respective locations after the photo is taken on a future EVA.

· Tunnel Zip Ties: I used 5 zip ties on the interior of the tunnel, and then an additional 10 on the exterior to secure the outer tarps to the tunnel mesh better. Snips were taken on EVA and returned.

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: None

Operations Report – April 29th

Crew 315 Operations Report 29-04-2025

SOL: 9

Name of person filing report: Michael Andrews

Non-nominal systems: Catalytic Heater, Two Piece Space Suits

Notes on non-nominal systems:

· (Bonus project) The catalytic heater near the exercise bike in the habitat does not work. It’s an engineering project to see if this can get properly started during this mission. Barring any more impactful repairs needed, this project will be worked tomorrow.

· (Unresolved from yesterday): Some of the two-piece suits have slight variations in functionality. One of the suit’s battery displays don’t work, and another one has a rather noisy fan. I’d like to focus on these two tomorrow to see if I can fix them like I did with suit #10 today.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: Yes

Curiosity rover used: Yes

Hours: 317.3 hours (1.2 hours used)

Beginning charge: 100%

Ending charge: 61%

Currently charging: No

Perseverance rover used: Yes

Hours: 355.9 hours (1.4 hours used)

Beginning charge: 100%

Ending charge: 60%

Currently charging: Yes

General notes on rovers: None

Summary of Hab operations: Performed two EVAs, made blueberry pancakes for breakfast, leftover for lunch, and brownies/burritos/pasta for dinner.

Water Use (please use both methods to estimate water usage)

Time of measurements: 1900
1) Per formula: 27.78 gallons
2) Smart Home Dashboard: 27.5 gallons

Water (static tank, remaining gallons): 224.88 gallons

Static tank pipe heater: No

Static tank heater: No

Toilet tank emptied: No

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects, and complete professional work.

Summary of suits and radios:

· EVA 16: Suits 8, 9, 11 and Radios 1, 3, 5

· EVA 17: Suits 7, 8, 9 and Radios 1, 3, 5

Summary of GreenHab operations: Watered plants and fungal project.

WATER USE: 10 gallons

Heater: Off

Supplemental light: Off

Harvest (name, weight in grams): None

Summary of ScienceDome operations: None

Dual split: Off

Summary of RAM operations:

· Mousetrap Repair: The mouse trap that we received from Mission Support seemed to not fully function and when we caught the mouse last night, he easily got out when trying to move the cage. Looking up the trap brand online revealed that it is missing two retaining bars to keep each door shut once activate. Using about a foot of steel wire, these bars were fabricated and installed for the next attempt.

· Tunnel Zip Ties: I replaced two broken zip ties from the RAM and also used snips to cut some metal ties that were not holding onto anything. Duct tape was also added to the interior surface of any repairs that were made on the exterior from EVA 16 to make them more robust.

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: None

Operations Report – April 30th

Crew 315 Operations Report 30-04-2025

SOL: 10

Name of person filing report: Michael Andrews

Non-nominal systems: Catalytic Heater

Notes on non-nominal systems:

· (Bonus project) The catalytic heater near the exercise bike in the habitat does not work. It’s an engineering project to see if this can get properly started during this mission. Barring any more impactful repairs needed, this project will be worked tomorrow.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Curiosity rover used: Yes

Hours: 317.8 hours (0.5 hours used)

Beginning charge: 100%

Ending charge: 83%

Currently charging: No

Perseverance rover used: Yes

Hours: 356.8 hours (0.9 hours used)

Beginning charge: 100%

Ending charge: 59%

Currently charging: Yes

General notes on rovers: None

Summary of Hab operations: Performed two EVAs, made our own breakfasts, made strawberry shortcake bread and Funfetti cake, watched some TV shows together.

Water Use

Time of measurements: 1845
1) Per formula: 24.51 gallons
2) Smart Home Dashboard: 26.25 gallons

Water (static tank, remaining gallons): 200.38 gallons

Static tank pipe heater: Off

Static tank heater: Off

Toilet tank emptied: No

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects, and complete professional work.

Summary of suits and radios:

· EVA 18: Suits 9, 11 and Radios 3, 4

· EVA 19: Suits 7, 9 and Radios 2, 3

Summary of GreenHab operations: Watered plants and fungal project, harvested microgreens and herbs for dinner.

WATER USE: 10 gallons

Heater: On

Supplemental light: Off

Harvest (name, weight in grams): microgreens, herbs, and tomatoes (150g)

Summary of ScienceDome operations: None

Dual split: Off

Summary of RAM operations:

· Space Suit Repair: Suit #1’s inoperable battery life screen was fixed just by fixing some loose wires inside the suit’s pelican case, and Suit #5’s noisy fan was fixed with a good dose of canned air to the fan. As of now, all space suits are operational and repaired.

· Tunnel Repair: No major tunnel repairs to the tarp or zip ties were needed.

· Rear Airlock Door: The sliding bolt mechanism for the door has always been finicky and I wanted to upgrade it today. I added some eyelets to the bolt’s path and relocated the handle. It now slides only left to right instead of all over the place.

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: Where is the personal gas monitor located? Tomorrow afternoon looks like a good time to work on the catalytic heater!

Supplemental Operations Report – April 26th

Date: 4/26/2025
Name of person filing report: David Steinhour
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters, generator. Robotic observatory. HAB outer shell. Spirit. Director trailer furnace.

Power system: "Solar: The battery bank does not hold charge when sun is down and low on the horizon. Inverter Slave 1 and 2 went offline and do not restart, which limits us to 4kW when on solar.
Main generator has been monitored for oil leaks; minor leaks observed, Moreover, generator is consuming oil because of worn piston rings. Adding oil every day is necessary. Generator is limited to 8kW, see previous reports for details. Engine governor has been replaced, and the threads of one of the governer bolts was stripped and repaired with a heli-coil insert. A new gasket was installed and no further leaks have been observed.

1) Oil, oil filter and air filter changed on 04/11/2025. Hours: 9260.2
2) Current hours – 9400.6"

Propane Readings: "Refilled 4/24
Station Tank: 81%
Director Tank: 82%
Intern Tank: 86%
Generator Tank: 75%"

Water: "Hab Static Tank – 320 gallons
GreenHab – 138 gallons
Outpost tank – 550 gallons"

Rovers: "Sojourner rover used: Yes
Hours: 213.4
Beginning Charge: 100 %
Ending Charge: 100 %
Currently Charging: No
Notes on Rovers: Spirit is not charging. Perseverance’s parking brake was successfully adjusted, but will need new brake pads soon (no more adjustment to do). Curiosity’s battery meter is occasionally lagging behind / updating slowly. Both Perseverance and Curiosity had battery maintenance on 4/24. "

Cars: "Hab Car used and why, where: To Hanksville for supplies.
Crew Car used and why, where: By crew from Grand Junction.
General notes and comments: Crew car driver’s side front ball joint is bad. Low oil pressure is most likely caused by a bad sensor (it does not change due to RPM or temperature like it should)."

Summary of Internet: Nominal
EVA suits and radios: "Suits: Suit #7 is not charging, and it appears to be a problem with the suit itself.
Comms: Nominal.
T-Echo EVA-link: Nominal"
Campus wide inspection, if action taken, what and why: Nominal
Summary of Hab Operations: Small cracks in the wall of the Hab in the loft area are allowing cold air intrusion. Static tank and pipe heaters unplugged. Thermostat setup for 60F due to warm weather.
Summary of GreenHab Operations: Nominal
Summary of SciDome Operations: Dual split is being turned on during day time for cooling.
Summary of Observatories Operations: Robotic observatory offline.
Summary of RAM Operations: Nominal
Summary of Outpost Operations: Director trailer’s furnace not turning on. Will diagnose and update.
Summary of Health and Safety Issues: Nominal

Operations Report – April 26th

Crew 315 Operations Report 26-04-2025

SOL: 6

Name of person filing report: Michael Andrews

Non-nominal systems: Suit Charger #7, Catalytic Heater, ScienceDome Radio Charger

Notes on non-nominal systems:

· (Unresolved from yesterday) It was noted that Suit #7 wasn’t charging, but further diagnosis from the Commander has isolated the issue to the #7 charger. I was able to observe that all chargers appear to work, so more formal diagnoses are required. (Note: this one has been on here a while, but we don’t any issues with chargers anymore, so this is low priority to work.)

· (Bonus project) The catalytic heater near the exercise bike in the habitat does not work. It’s an engineering project to see if this can get properly started during this mission.

· (Unresolved from yesterday) The ScienceDome radio chargers do not work. Mission support mentioned how this is a known issue. Radios will be swapped between the two structures, and I will disassemble the charger tomorrow.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Curiosity rover used: Yes

Hours: 314.9 hours (1.1 hours used)

Beginning charge: 100%

Ending charge: 48%

Currently charging: Yes

Perseverance rover used: Yes

Hours: 329.9 hours (1.4 hours used)

Beginning charge: 100%

Ending charge: 56%

Currently charging: No

General notes on rovers: None

Summary of Hab operations: The team took this as a day of rest, performing only one EVA and working on other projects and personal time. The 5th (of 8) 100cameras project was held, and the team made cookies and spaghetti throughout the day. We also enjoyed Commander Laude’s show-and-tell of electronic hardware over the decades and an episode of Moonbase 8.

Water Use

Time of measurements: 1930
1) Per formula: 24.51 gallons
2) Smart Home Dashboard (see notes): 23.75 gallons

Water (static tank, remaining gallons): 303.3 gallons

Static tank pipe heater: Off

Static tank heater: Off

Toilet tank emptied: No

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects

Summary of suits and radios:

· EVA 11: Suits 8, 9, 10 and Radios 1, 4, 5

Summary of GreenHab operations: Watered plants and fungal project, kept the door open for most of the day to drive down temperature. Also harvested a small amount of basil for dinner.

WATER USE: 10.0 gallons

Heater: Yes

Supplemental light: 1900-2200

Harvest: 7g of basil

Summary of ScienceDome operations: I attempted to 3D scan the sample collected from EVA #10, but had difficulties with computer storage and had to abort the activity to be attempted later tonight.

Dual split (Heat or AC, On or Off): Off

Summary of RAM operations: No notable RAM activity today besides receiving a resupply of duct tape, flour, and raisin bran cereal. I also did want to report a broken plastic clamp that cracked when I was attempting to prototype the 3D scanning shroud earlier. I have tossed it in the RAM trash, and there are still 2 metal (and more resilient) clamps in inventory.

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: None

Operations Report – April 27th

Crew 315 Operations Report 27-04-2025

SOL: 7

Name of person filing report: Michael Andrews

Non-nominal systems: Suit Chargers (In General), Catalytic Heater, ScienceDome Radio Charger, Shower Hose

Notes on non-nominal systems:

· (Unresolved from yesterday) It was noted that Suit #7 wasn’t charging on the first day of EVAs, but further diagnosis from the Commander has isolated the issue to the #7 charger. Today, I noticed that Suit 10’s battery (my suit!) had not charged overnight. I am bumping this up in priority to resolve tomorrow afternoon.

· (Bonus project) The catalytic heater near the exercise bike in the habitat does not work. It’s an engineering project to see if this can get properly started during this mission.

· (Unresolved from yesterday) The ScienceDome radio chargers do not work. Mission support mentioned how this is a known issue. Radios will be swapped between the two structures, and I will disassemble the charger tomorrow.

· (New Project): The Commander noticed that the shower hose was leaking and spraying excess water. He tightened it and resolved about 80% of the leakage, but I’d like to take apart the system and remove the other 20% with plumber’s tape.

ROVERS

Spirit rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Opportunity rover used: No

Hours: N/A

Beginning charge: N/A

Ending charge: N/A

Currently charging: No

Curiosity rover used: Yes

Hours: 315.8 hours (0.7 hours used)

Beginning charge: 100%

Ending charge: 50%

Currently charging: No

Perseverance rover used: Yes

Hours: 331.0 hours (1.1 hours used)

Beginning charge: 100%

Ending charge: 39%

Currently charging: No

General notes on rovers: None

Summary of Hab operations: The team made egg cups for breakfast, apple cinnamon bread, and kanji with spam and glaze. Module 6 of the 100cameras project was completed. The team mainly stayed inside to weather out the day’s high winds.

Water Use

Time of measurements: 1945
1) Per formula: 24.51 gallons
2) Smart Home Dashboard: 30 galons

Water (static tank, remaining gallons): 278.80 gallons

Static tank pipe heater: No

Static tank heater: No

Toilet tank emptied (no or yes): Yes

Summary of internet: Used to complete reports, learn languages, share team photos via Google drive, researching projects, and complete professional work.

Summary of suits and radios:

· EVA 12: Suits 7, 10 and Radios 1, 4

· EVA 13: Suits 9, 10 and Radios 3, 4

Summary of GreenHab operations: The Crew Journalist watered the plants, harvested some chives, and set out soil samples to dry on the bench.

WATER USE: 8.0 gallons

Heater: On

Supplemental light: 1900-2200

Harvest: 20g chives

Summary of ScienceDome operations: The Crew Journalist worked on her desiccated soil experiment samples this afternoon and the Crew Artist used the ‘Dome for sketching and journaling.

Dual split: Off

Summary of RAM operations: not many operations as I did double-EVAs, but I do have quite a bit of engineering debt to focus on tomorrow afternoon, as mentioned by the off-nominal systems above.

· Tunnel Zip Ties: the recent high winds have worn down the tunnel components more than normal. 14 zip ties were consumed from the RAM to repair the tunnel, and snips were used to trip them to size. Future work is needed on EVA #14 to patch some pre-existing holes in the tarp with duct tape from both sides.

Summary of any observatory issues: None

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: I did notice that the electrical conduit in the airlock runs over the American flag that is painted on the wall. The conduit has some flexibility in it, and I would like to try to unbolt it from the wall and re-route around the flag so it’s not obstructed. I believe this can be done without pulling on the conduit or editing it. However, I would like to get alignment before I tried that.

Operations Report – April 10th

Crew 314 Operations Report 10Apr2025

SOL: 4

Name of person filing report: Antoine (Crew Engineer)

Non-nominal systems :

The toilet repair performed yesterday is still holding and functioning properly.

The CO detector in the science dome is not working.

Notes on non-nominal systems : /

ROVERS

Spirit rover used: /

Hours: /

Beginning charge: /

Ending charge: /

Currently charging: /

Opportunity rover used:

Hours: 214.8 (0.4 used)

Beginning charge: 100%

Ending charge: 65%

Currently charging: No

Curiosity rover used:

Hours: 306.9 (0,4 used)

Beginning charge: 100%

Ending charge: 73%

Currently charging: No

Perseverance rover used:

Hours: /

Beginning charge: /

Ending charge: /

Currently charging: /

General notes on rovers: Spirit is still out of use due to a battery issue.

Summary of Hab operations : Today in the Habitat, we focused on cooking, socializing, completing our individual reports, and working on our respective experiments. Additionally, we did a bit of physical exercise to stay in shape. Finally, we held our usual team meeting to discuss progress and upcoming tasks.

Water Use (please use both methods to estimate water usage)

Time of measurements (collect data for the same time window): 7 p.m.
1) Per formula (see notes): 15.55 gallons
2) Smart Home Dashboard (see notes): 15.08 gallons

Water (static tank, remaining gallons): 374.99 gallons (per formula) & 392.88 gallons (Smart Home Dashboard)

Static tank pipe heater (on or off): on

Static tank heater (on or off) : on

Toilet tank emptied (no or yes): no

Summary of internet: used for music playing, mails, research for experiments, learning languages.

Summary of suits and radios (EVA #6) :

Suits : 2, 4 and 5.

Radio : 3, 4 and 5.

Summary of GreenHab operations: put notes here: I watered all the plants with water.

The door of the GreenHab was left open for 3 hours 35 minutes (2.10 pm to 5.45 pm) to reduce the temperature inside (maximum of 98.8 °F)

WATER USE: 9 gallons

Heater (On or Off): Heater on (setup temperature = 72°F)

Supplemental light (hours of operation): 7-10 pm

Harvest (name, weight in grams): 4 g of parsley and 6 g of basilic

Summary of ScienceDome operations: put notes here

Inoculation of Esherichia coli on 96 well plate + UV-C exposure

Inoculation of Bacillus thuringiensis on petri dishes + soil+ UV-C exposure

Isolation of arbuscular fungi spores (after exposure to stresses)

Disinfection of arbuscular fungi spores

Spores on a membrane to test the germination after exposure to stresses

Plantain seedlings (use for experiment) watering

Dual split (Heat or AC, On or Off): Off

Summary of RAM operations: (Tools used, work done)

At 9:20 a.m., the Crew Engineer took 2 zip ties and a dark ribbon to repair equipment in the field if needed. However, no repair was necessary, and all materials were returned to their place.

Around noon, the HSO Officer went to the RAM to take 2 inches of blue tape to label a container and indicate its intended contents.

Around 4:00 p.m., the Crew Engineer took 6 small zip ties, 3 large ones, 50 inches of wire, and 20 inches of grey vinyl duct tape to reattach tarps and seal holes.
Summary of any observatory issues: None for the moment.

Summary of health and safety issues: Everyone was in good health today, with no issues reported. There were no safety concerns to note.

Questions, concerns and requests to Mission Support: None for the moment.

Copyright © The Mars Society. All rights reserved. | Main Site