Operations Report – December 22nd

Report title: Operations Report
Crew #: 325
Position: Crew Engineer
Report prepared by: Morgan McCoy
Date: 22Dec2025
Sol:7

Non-nominal systems:
Notes on non-nominal systems:
ROVERS
Curiosity rover used: EVA #8 –
Hours: 387.6
Beginning charge: 100%
Ending charge: 48%
Currently charging: No
Perseverance rover used: EVA #8 Ellenah Del Rio & Cesare Guariniello
Hours: 340.1
Beginning charge: 100%
Ending charge: 31%
Currently charging: No
General notes on rovers:
Nominal
Summary of Hab operations:
Water Use: 29.26 gallons / day
Main tank level: 86 gallons
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: YES
Summary of internet:
Nominal
Summary of suits and radios:
EVA #8 – Suit 2 – Cesare Guariniello – Start 13.7 V, End 12.7 V – A06
EVA #8 – Suit 8 – Morgan McCoy – Start 13.7 V, End 12.8 V – A01
EVA #8 – Suit – Ellenah Del Rio – Start 13.7 V, end 12.4 V – A05
Summary of GreenHab operations:
Adrianna Waterford: More microgreens planted and crop beds have been revived from the previous crew. Hydroponics system is still being monitored.
Water use: 1 gallons
Heater: ON
Supplemental light: 0 hrs
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations:
Checks on running experiments by Saranya Ravva, Adrianna Waterford, Isabella Levine
Dual split: HEAT
Summary of RAM operations: None
Summary of any observatory issues: (use information from the Astronomy report report)
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: None

Operations Report – December 23rd

Report title: Operations Report
Crew #: 325
Position: Crew Engineer
Report prepared by: Morgan McCoy
Date: 23Dec2025
Sol:8

Non-nominal systems:
Notes on non-nominal systems:
ROVERS
General notes on rovers:
No Rovers used
Summary of Hab operations:
Water Use: 5PM – 20.38 gallons/day
Main tank level: 5PM – 151 Gallons
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: NO
Summary of internet:
Nominal
Summary of suits and radios:
EVA#9 Suit 8 – Morgan McCoy – Start 13.7 Volt, End 12.9 Volt – A06
EVA#9 Suit 9 – Ellenah Del Rio – Start 12.7 Volt, End 7.1 Volt – A04
EVA#9 Suit 10 – Adrianna Waterford – Start 13.7 Volt, end 12.9 Volt – Ao1
Headset #1 receives but does not send, microphone broken. Headset #3 worked on different radio

Summary of GreenHab operations: Addriana Waterford: Hydroponics system is still being monitored.
Water use: 1 gallons
Heater: ON
Supplemental light: 0 hours
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations:
Checks on running experiments by Saranya Ravva, Adrianna Waterford, Isabella Levine
Dual split: Heat
Summary of RAM operations: None
Summary of any observatory issues: None
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: None

Operations Report – December 24th

Report title: Operations Report
Crew #: 325
Position: Crew Engineer
Report prepared by: Morgan McCoy
Date: 24Dec2025
Sol: 9

Non-nominal systems:
Notes on non-nominal systems:
ROVERS
Curiosity rover used: EVA #10 – Addriana Waterford & Isabella Levine
Hours: 340.8
Beginning charge: 100%
Ending charge: 32%
Currently charging:NO
Perseverance rover used: EVA #10 -Saranya Ravva
Hours: 388.3
Beginning charge: 100%
Ending charge: 52%
Currently charging: No
General notes on rovers:
Nominal
Summary of Hab operations:
Water Use: 38.87 Gallons/day
Main tank level: 116 Gallons
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: NO
Summary of internet:
Summary of suits and radios:
EVA #10 Suit 6 – Isabella Levine – Low airflow and battery drained rapidly, replaced with new battery. New battery was tested and dropped from 12.9 Volts to 12.5 Volts after 2 hrs of use.
EVA #10 Suit 8 – Saranya Ravva – Start 13.7 Volt, End 12.7 Volt, A06
EVA #10 Suit 9 – Isabella Levine – Start 13.6 Volt, End 12.4 Volt, A04
EVA #10 Suit 10 – Addriana Waterford – Start 13 Volt, End 12.9 Volt, A01
Summary of GreenHab operations:
Addriana Waterford: Hydroponics system is still being monitored.
Water use: 1 gallons
Heater: ON
Supplemental light: 0 hours
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations: put notes here
Dual split: Heat
Summary of RAM operations: None
Summary of any observatory issues: None
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: None

Operations Report – December 25th

Report title: Operations Report
Crew #: 325
Position: Crew Engineer
Report prepared by: Morgan McCoy
Date: 25Dec2025
Sol: 10

Non-nominal systems:
Notes on non-nominal systems:
ROVERS
Curiosity rover used: EVA #11 – Morgan McCoy & Isabella Levine
Hours: 341.1
Beginning charge: 100%
Ending charge: 40%
Currently charging: NO
Opportunity rover used: EVA #11 -Saranya Ravva
Hours: 239.1
Beginning charge: 100%
Ending charge: 39%
Currently charging: No
General notes on rovers:
Nominal
Summary of Hab operations:
Water Use: 40.01 Gallons/day
Main tank level: 164 Gallons
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: YES
Summary of internet:
Nominal
Summary of suits and radios:
EVA #11 Suit 8 – Morgan McCoy – Start 13.1 Volt, End 12.2 Volt,
EVA #11 Suit 9 – Isabella Levine – Start 13.3 Volt, End 12.2 Volt,
EVA #11 Suit 10 – Saranya Ravva – Start 12.8 Volt, End 12.2 Volt,
Summary of GreenHab operations:
Addriana Waterford: Hydroponics system is still being monitored. Flower beds have been weeded and prepped for incoming crew. Inventory is complete and has been sent.
Water use: 1 gallons
Heater: ON
Supplemental light: 0 hours
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations:
Dual split: Heat
Summary of RAM operations: None
Summary of any observatory issues: None
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: None

Operations Report – December 26th

Report title: Operations Report
Crew #: 325
Position: Crew Engineer
Report prepared by: Morgan McCoy
Date: 26Dec2025
Sol: 11

Non-nominal systems:
Notes on non-nominal systems:
ROVERS
General notes on rovers:
Nominal
Summary of Hab operations:
Water Use: 3 PM: 52.14 gallons/day
Main tank level: 138 gallons
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied:
Summary of internet:
Nominal
Summary of suits and radios:
EVA #12 Suit 10 – Addriana Waterford – Start 13.2 V, end 13.2 V
EVA #12 Suit 9 – Isabella Levine – Start 12.7 V, end 11.7 V
EVA #12 Suit 8 – Ellenah Del Rio – Start 13.8 V, end 12.9 V
EVA #12 Suit 2 – Cesare Guariniello – Start 13.6 V, end 13.3 V
Summary of GreenHab operations: Cleaned for end of mission
Water use: 1 gallons
Heater: ON
Supplemental light: 0 hours
Harvest (name, weight in grams): N/A
Summary of ScienceDome operations: Cleaned for end of mission
Dual split: Heat
Summary of RAM operations: Cleaned for end of mission
Summary of any observatory issues: None
Summary of health and safety issues: None
Questions, concerns and requests to Mission Support: None

Supplemental Operations Report – December 27th

Date: 12/27/2025
Name of person filing report: Sergii Iakymov
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. Hab outer shell. Spirit. Dir trailer water heater.

Power system:
Plan to overhaul inverter/battery system approved. Scheduled for January 2026.
1) 200 hr maintenance (including oil, oil filter, and air filter change) expected on 12/28/2025
2) Current generator hours – 1064

Propane Readings:
Station Tank: 69%
Director Tank: 62%
Intern Tank: 65%
Generator Tank: 33%
Propane refilled on 12/15

Water:
Hab Static Tank – 480 gallons
GreenHab – 200 gallons
Outpost tank – 400 gallons
Septic Tanks emptied: No

Rovers:
Sojourner rover used: Yes. Around the campus.
Hours: 222.3
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes
Spirit Rover has a contactor issue so will not run. Burned contactor removed and a new one is ordered.

Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pickup/drop off
General notes and comments: Crew car driver’s side front ball joint is bad

Summary of Internet: Nominal.
EVA suits and radios:
Suits: Nominal.
Comms: Nominal
T-Echo EVA-link: Nominal

Campus wide inspection, if action taken, what and why: Hab driveway security camera replaced.
Summary of Hab Operations: Nominal.
Summary of GreenHab Operations: Nominal. Environmental sensor replaced.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Nominal. Robotic observatory repaired on 12/16.
Summary of RAM Operations: Nominal.
Summary of Outpost Operations: Director’s trailer: water heater propane burner does not heat, only electrical heater works. Possible cause is its control board and replacement is pending. Water pump pressure switch replaced.
Summary of Health and Safety Issues: Nominal.

HSO Beginning of Mission Checklist – December 28th

Report title: HSO Beginning Of Mission Checklist
Crew #: 326
Position: Health & Safety Officer
Report prepared by: Katharina Guth
Date: 12-28-2025

Part 1
Locate and confirm the emergency escape routes in the Hab are functional and clear:

Stairs (between lower end upper deck) – Confirmed
Emergency window (upper deck, east side) – Confirmed
Commander’s window (located in the commander’s crew quarter) – Confirmed but not very functional during emergency (window would have to be broken)

Part 2
Inventory First Aid kit and note what needs to be refilled:

HAB Lower Deck:

Min

Item

Code

Satisfactory

Inventory

16

Adhesive Bandage, 1”x3”

FAE-3001/3010

YES

Plastic Bandages, ¾”x3” (FAE-3004) contains 16+
BAND-AID contains 25+

1

Adhesive Tape, 2.5yd (total)

FAE-6000

See Other

Running low on self-adhering sports wrap 4”
3 close-to-empty rolls of athletic tape

10

Antibiotic Application 1/57 oz

FAE-7021

NO

Inventory: 2

10

Antiseptic 1/57 oz

FAE-4002

NO

Inventory: 7

1

Breathing Barrier

FAE-6015

YES

1 CPR Face Shield (90643)

1

Burn Dressing (gel soaked) 4”x4”

FAE-7012

YES

Inventory: 1

10

Burn Treatment 1/32 oz

FAE-7011

YES

Inventory: 11

1

Cold Pack 4”x5”

FAE-6012

YES

1 Instant Cold Compress (72401)

2

Eye Covering w/ means of attachment 2.9sq in

FAE-6022

NO

Eye covering packaging was falling apart and no longer seemed hygienic, so it was tossed.

1

Eye/Skin Wash 1fl oz

FAE-6022

YES

Inventory: 1

1

First Aid Guide

FAE-6017

YES

6

Hand Sanitizer 1/32 oz

FAE-4007

NO

Inventory: 5

4

Medical Exam Gloves

FAE-6018

YES

2 FAE-6018
2 Loose gloves box

1

Roller Bandage 2”x4yd

FAE-5002

YES

3 different elastic bandages
½ self-adhering sports wrap

1

Scissors

FAE-6004

YES

2

Sterile Pad 3”x3”

FAE-5005

YES

Inventory: 10

2

Trauma Pad 5”x9”

FAE-6024

NO

Potentially in bleeding control kit?

1

Triangular Bandage 40”x40”x56”

FAE-6007

YES

1 Triangular Bandage (90643)
3 additional in box

Science Dome: Inventory list is not provided. It appears satisfactory. Missing band-aids.

EVA Bag: Inventory is satisfactory

Part 3
Note any safety issues:
– RAM Black Intercom communication is weak back to HAB (However HAB to RAM through Black Intercom is loud and clear).
– The Commander’s window is nailed shut and the emergency route would be breaking it open.

Note any health/environmental issues: None

Note any missing or recommended health and safety supplies: The science dome inventory list is not provided. It seems to include most supplies; however, it does not include (e.g.) band-aids.

Lower Hab First Aid kit missing supplies are listed above (according to the inventory list).

Part 4
Using the attached Safety Equipment Inventory, locate, test and confirm operation of all safety equipment. List any equipment not found and/or missing. See notes on the next page.

Black intercom RAM to HAB is weak and quiet. However, HAB to RAM using black intercom is loud and clear.

Note that the radio channel 22 is still listed. It is now channel 17.

Safety Equipment Inventory

HAB Upper deck

HAB Lower deck

RAM

Green Hab

Science Dome

Escape ladder

X

N/A

N/A

N/A

N/A

Eyewash

N/A

N/A

N/A

N/A

X

Fire blanket

X

N/A

X

N/A

X

Fire extinguisher

X

X

X

X

X

First Aid

N/A

X

N/A

N/A

X

Intercom

X

N/A

X-unclear

X

X

Radios (Channels 10 and 22 17)

X

X

X

X

X

Nightlight

X

X

X

N/A

X

Carbon Monoxide alarm

X

X

X

X

X

Smoke alarm

X

X

X

X

X

Propane alarm

X

X

N/A

N/A

N/A

EVA Safety Kit

N/A

X

N/A

N/A

N/A

End of report

Operations Report – December 29th

Report title: Operations Report
Crew #: 326
Position: Crew Engineer
Report prepared by: Iris Stevenson
Date: 29-12-2025
Sol: 1

Non-nominal systems:
HAB Power
RAM comms
Toilet tank indicator light

Notes on non-nominal systems:
Power: continuous brownouts throughout the day. Resolved when bread maker and microwave (used separately) were turned off. Longest brownout lasted approximately 3 minutes at 1245. Bread maker will now be used only after sundown on propane generator power. Additional brownouts following appliance shutoff throughout afternoon including multiple in rapid succession around 1600.

RAM intercom: Faint and quiet during HSO testing on Sol 0. Tested again at 1400 on Sol 1 and reproduced results from Sol 0. Radios nominal.
Toilet tank indicator light flickering at 2/3 full.

ROVERS

Spirit rover used: NONOPERATIONAL
Hours:
Beginning charge:
Ending charge:
Currently charging:

Opportunity rover used: EVAs #1 and #2
Hours: 240.5
Beginning charge: 100%
Ending charge: 64%
Currently charging: YES

Curiosity rover used: NOT USED
Hours:
Beginning charge:
Ending charge:
Currently charging: YES

Perseverance rover used: EVAs #1 and #2
Hours: 389.2
Beginning charge: 100%
Ending charge: 64%
Currently charging: YES

General notes on rovers:

Summary of Hab operations:
Water Use 1800 (see notes): 27.87 gal
Main tank level (remaining gallons, see notes): 388.1 gal
Main water tank pipe heater (ON or OFF): ON
Main water tank heater (ON or OFF): ON
Toilet tank emptied (NO or YES): NO

Summary of internet: Nominal

Summary of suits and radios:
Radio used by Crew Scientist provided continuous static and had inconsistencies with transmission. All others nominal

Summary of GreenHab operations:
Water use: 1 gallon
Heater (ON or OFF): ON
Supplemental light (hours of operation): 6
Harvest (name, weight in grams): None

Summary of ScienceDome operations:
Crew Scientist performed small-scale destructive testing on small geological samples collected during EVA #2
Dual split (Heat or AC, On or Off or Automatic): Automatic

Summary of RAM operations:
Greenhab Officer and Crew Journalist worked on their autonomous robot in the RAM during EVA#2 and afterwards using RAM scissors and their own additional tools

Summary of any observatory issues:

Summary of health and safety issues:

Questions, concerns and requests to Mission Support:

Operations Report – December 30th

Report title: Operations Report
Crew #: 326
Position: Crew Engineer
Report prepared by: Iris Stevenson
Date: 30-12-2025
Sol: 2

Non-nominal systems:

  • Toilet tank indicator light
  • Electricity

Notes on non-nominal systems:

  • Toilet tank indicator light: 2/3 light turned on during Sol 1 but turned off during Sol 2. Was not on when emptied at 11:15 on Sol 2, and 1/3 light was still on once the tank had emptied.
  • Electricity: brownouts at 11:06, 12:01, 12:06

ROVERS
Spirit rover used: NONFUNCTIONAL
Hours:
Beginning charge:
Ending charge:
Currently charging:
Opportunity rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging: YES
Curiosity rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging: YES
Perseverance rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging: YES
General notes on rovers:

Summary of Hab operations:
Water Use 18:00: 23.80 gal
Main tank level: 364.4 gal
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: YES
Summary of internet: Nominal
Summary of suits and radios: Recurring issues with one EVA radio. Labeled as such and will not be used further this rotation.
Summary of GreenHab operations:
Water use: 1 gallon
Heater: ON
Supplemental light: 4 hours
Harvest: None
Summary of ScienceDome operations:

  • Greenhab Officer used ScienceDome for autonomous rover testing

Dual split : Automatic
Summary of RAM operations:

  • Greenhab Officer completed work on autonomous rover project using her own tools

Summary of any observatory issues:
Summary of health and safety issues:
Questions, concerns and requests to Mission Support:

Operations Report – December 31st

Report title: Operations Report
Crew #: 326
Position: Crew Engineer
Report prepared by: Iris Stevenson
Date: 31-12-2025
Sol: 3

Non-nominal systems:

  • Power

Notes on non-nominal systems:

  • Several brownouts at 1150, 1208, 1257, and 1306. Switched to propane at 1415 following 1306 brownout.

ROVERS
Spirit rover used: NONFUNCTIONAL
Hours:
Beginning charge:
Ending charge:
Currently charging: No
Opportunity rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging: NO
Curiosity rover used: Health and Safety Officer and Crew Engineer
Hours: 342.0
Beginning charge: 100%
Ending charge: 46%
Currently charging: NO
Perseverance rover used: Greenhab Officer and Crew Engineer
Hours: 389.6
Beginning charge: 100%
Ending charge: 53%
Currently charging: NO
General notes on rovers:

Summary of Hab operations:
Water Use: 23.46 gal
Main tank level: 340.9 gal
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: NO
Summary of internet: Nominal
Summary of suits and radios: Nominal
Summary of GreenHab operations: (use information from the GreenHab report)
Water use: 1 gallon
Heater: ON
Supplemental light: 4
Harvest: None
Summary of ScienceDome operations:

  • Crew Scientist used oven and his own tools to manufacture bricks for his research project with the help of the Crew Journalist

Dual split: Automatic
Summary of RAM operations:

  • Greenhab Officer used her own tools to finish her autonomous rover

Summary of any observatory issues:
Summary of health and safety issues:
Questions, concerns and requests to Mission Support:

  • Request that rovers Curiosity, Perseverance, and Opportunity are plugged in
  • Request for troubleshooting/recommendations for when to next empty toilet tank due to issues with level lights (such as average time to full with a crew of 7)
  • Request for trash in RAM airlock to be removed (bathroom trash on North edge, HAB non-burnable on South edge)
Copyright © The Mars Society. All rights reserved. | Main Site