Supplemental Operations Report – June 21st

Name of person filing report: Sergii Iakymov

Reason for Report: End of the season.

Power system:
Solar: Nominal. The network gateway has been reconnected to the station Orbi wifi network.SOC Last 24 hours: Max 100%; Min 78 %; Avg 87.8%.
VDC Last 24 hours: Max 58.64V; Min 47.40V; Avg 52.65V.Generator run time: generator hours 3827.7. Generator locked for the summer break.

Propane Reading Station Tank: 75%. Valve closed for summer.
Propane Reading Director Tank: 56%. Valve closed for summer.
Propane Reading Intern Tank: 71%. Valve closed for summer.
Propane Reading Generator Tank: 79%. Valve closed for summer.

Water (Static Tank) – 320 gallons
Water in GreenHab – 152 gallons
Water (Outpost tank) – 120 gallons
Water in Science Dome: 0 gallons
Hab Toilet Tank emptied: Yes

Notes on Rovers: All rovers moved to Rock Shop for summer break.

Sojourner rover used: Yes.
Hours: 194.3
Ending Charge: 59%
Currently Charging: Yes

Curiosity rover used: Yes.
Hours: 244.8
Ending Charge: 69%
Currently Charging: Yes

Perseverance rover used: Yes.
Hours: 266.7
Ending Charge: 70%
Currently Charging: Yes

Opportunity

rover used: Yes.
Hours: 136.6
Ending Charge: 99%
Currently Charging: Yes

Spirit

rover used: Yes.
Hours: 226.7
Ending Charge: 85%
Currently Charging: Yes

ATV’s Used: (Honda, 350.1, 350.2, 300): None
Reason for use: n/a
Oil Added? No
ATV Fuel Used: 0 Gals
Ethanol Free Gasoline — 0 Gallons
# Hours the ATVs were Used today: 0
Notes on ATV: All parked at the outpost and awaiting to be taken to service.

HabCar used and why, where? Yes. To Hanksville for supplies to pick up. Final mileage – 169558.5, gas – 25%. Oil change – past due.

Crew Car used and why, where? Yes. To/From Grand Junction and Hanksville. Final mileage – 217868, gas – 50%. Oil change on 06/10/2023, next one on 220621 miles.

General notes and comments: Crew car parked at the outpost and hab car at the campus.

Summary of Internet: Starlink unplugged and stored in the HAB. Orbi wifi network connected to HughesNet modem. All work is nominal.

Summary of suits and radios: All suits are picked up by the NorthCal chapter for refurbishing. Radios are placed in the ScienceDome.

EVA COMMS: All batteries separated from the radios and placed in the ScienceDome for summer. All radios are stored in the charging station locker for summer. Radio repeater disassembled and removed from the Hab ridge; Battery, solar panel, pelican case with all content and antenna placed in the Science Dome, all other parts in RAM.

Campus wide inspection, if action taken, what and why: All tarps are removed from the tunnels and inspected, stored in RAM. All tennis balls are collected. Security camera moved on the hab landing leg.

Summary of General Operations: All nominal. Conditions of interior and exterior, and all equipment were photographed.

Summary of Hab operations: Upper deck – fridge unplugged and emptied; All food moved out of the Hab; All unnecessary for summer devices have been unplugged; Remote controlled safety light is installed; Multiply mouse traps are setted up; Rat poison have been left in multiple places; Trash have been emptied. Lower deck – Outside outlets turned off; Toilet emptied; Heater breaker turned off; Water pump breaker turned off; Water pipe solenoid turned off; UV filter data logged and filter turned off; All unnecessary devices unplugged; shop vac and trash emptied; mouse traps are setted up; rat poison are placed around the deck.

Summary of GreenHab Operations: All temperature sensitive devices and fire extinguisher are moved to the Hab; rat poison placed around the area; HughesNet modem moved and plugged into the Hab.

Summary of SciDome Operations: All non-operational equipment were marked; Sink bucket emptied; Shop vac and trash emptied; Security camera placed at the power wall for observations; All unnecessary devices are unplugged; Two security lights are plugged via remote switch; All windows covered.

Dual Split in Science Dome: A/C is on for 74F.

Summary of any Observatory Issues: All parts were replaced and Observatory is operational.

Summary of RAM Operations: All temperature sensitive equipment were moved to Hab; Two big ladders from the tunnels were moved inside the RAM; Roll door were secured with a padlock; All outside and inside breakers are turned off; Outside breaker panel are locked; Trash is emptied;

Summary of Outpost Operations:

Exterior: Valve on the main propane tank is turned off; All outside extension cords are unplugged; Gates are closed and secured by metal wires.
Shed: Door latch is installed and door locked; Interior inventory is organized; Breakers turned off;
Intern’s trailer: Toilet emptied; fridge turned off; water and heater turned off; Internet and network gear moved into the Hab; Rat poison placed in the cabinets; propane valve turned off; door and storage compartment locked; All windows covered.
Director’s trailer: Toilet emptied; Fridge turned off; Water and heater turned off; All unnecessary devices unplugged; All batteries and temperature sensitive equipment moved into ScienceDome; Windows covered; Rat poison placed inside kitchen counter; Propane valve turned off; Front door locked.

Summary of Health and Safety Issues: Nothing to report.

Questions, Concerns, Supplies needed and Requests: Nothing to request.

Supplemental Report – June 4th

Name of person filing report: Sergii Iakymov

Reason for Report: Routine.

Non-Nominal Systems: Robotic observatory.
Action taken for non-nominal systems: New parts for Robotic observatory are received and installation is pending.

Power system:
Solar: Nominal. All input breakers of MPTT were off on June 2nd. After resetting the breaker work is normal.SOC Last 24 hours: Max 100%; Min 24 %; Avg 55%.
VDC Last 24 hours: Max 58.36V; Min 42.13V; Avg 50.02V.Generator run time: used during URC for 17.4 hours total. Generator hours 3827.7.

Propane Reading Station Tank: 75%
Propane Reading Director Tank: 56%
Propane Reading Intern Tank: 71%
Propane Reading Generator Tank: 68%

Water (Static Tank) – 480 gallons
Water in GreenHab – 152 gallons
Water (Outpost tank) – 250 gallons
Water in Science Dome: 0 gallons
Hab Toilet Tank emptied: Yes

Sojourner rover used: Yes.
Hours: 193.9
Beginning Charge: 100
Ending Charge: 100
Currently Charging: Yes
Notes on Rovers: All are plugged in, charged.
ATV’s Used: (Honda, 350.1, 350.2, 300): None
Reason for use: n/a
Oil Added? No
ATV Fuel Used: 0 Gals
Ethanol Free Gasoline — 0 Gallons
# Hours the ATVs were Used today: 0
Notes on ATV: All parked at the outpost and awaiting to be taken to service.

HabCar used and why, where? Yes. To Hanksville for supplies to pick up.

Crew Car used and why, where? Yes. To/From Grand Junction by URC/crew.

General notes and comments: The crew car needs oil change. Should be done during the next trip to Grand Junction.

Dual Split in Science Dome: A/C is on for 74F.

Summary of Internet: Nominal

Summary of suits and radios: All unplugged, visors covered, all chargers packed in the spare parts box. All radio chargers are unplugged.

EVA COMMS: Nominal.

Campus wide inspection, if action taken, what and why: all cleaned after URC.

Summary of General Operations: All nominal.

Summary of Hab operations: Cleaned after URC.

Summary of GreenHab Operations: Nothing to report.

Summary of SciDome Operations: Nominal.

Summary of any Observatory Issues: New parts for Robotic observatory are received and installation is pending.

Summary of RAM Operations: Nothing to report

Summary of Outpost Operations: Nominal.

Summary of Health and Safety Issues: Nominal.

Questions, Concerns, Supplies needed and Requests: Nothing to report

Supplemental Operations Report 28May2023

[title Supplemental Operations Report – May 28th]

Supplemental Operations Report 28May2023

Name of person filing report: Sergii Iakymov

Reason for Report: Routine.

Non-Nominal Systems: Robotic observatory.
Action taken for non-nominal systems: New parts for Robotic observatory are received and installation is pending.

Power system:
Solar: nominal. All input breakers of MPTT were off this week. After resetting the breaker and solar charger work was normal. Symptoms look like the breakers are overheating. A/C was turned to see if this helped the situation.SOC Last 24 hours: Max 100%; Min 58 %; Avg 76.9%.
VDC Last 24 hours: Max 58.59V; Min 46.59V; Avg 51.39V.Generator run time: not used. Generator hours 3810.3.

Propane Reading Station Tank: 75%
Propane Reading Director Tank: 59%
Propane Reading Intern Tank: 71%
Propane Reading Generator Tank: 72%

Water (Static Tank) – 550 gallons
Water in GreenHab – 152 gallons
Water (Outpost tank) – 360 gallons
Water in Science Dome: 0 gallons
Hab Toilet Tank emptied: Yes

Sojourner rover used: No.
Hours: 191.7
Beginning Charge: 100
Ending Charge: 100
Currently Charging: Yes
Notes on Rovers: All are plugged in, charged.
ATV’s Used: (Honda, 350.1, 350.2, 300): None
Reason for use: n/a
Oil Added? No
ATV Fuel Used: 0 Gals
Ethanol Free Gasoline — 0 Gallons
# Hours the ATVs were Used today: 0
Notes on ATV: All parked at the outpost and awaiting to be taken to service.

HabCar used and why, where? Yes. To Hanksville for supplies to pick up.

Crew Car used and why, where? Yes. To/From Grand Junction by crew.

General notes and comments: Nominal.

Dual Split in Science Dome: A/C is on for 74F.

Summary of Internet: Nominal

Summary of suits and radios: All unplugged, visors covered, all chargers packed in the spare parts box.

EVA COMMS: Chest pack washed and packed in the ziplock bags.

Campus wide inspection, if action taken, what and why: nothing to report

Summary of General Operations: All nominal.

Summary of Hab operations: Kitchen outlets fixed. During inspection it was noticed that the breaker is not all the way in its position. After resetting the breaker and GFCI outlet work is nominal.

Summary of GreenHab Operations: All plants are removed by crew 281 and GreenHab prepared for the off-season.

Summary of SciDome Operations: Nominal.

Summary of any Observatory Issues: New parts for Robotic observatory are received and installation is pending.

Summary of RAM Operations: Nothing to report

Summary of Outpost Operations:

Director’s trailer: Toilets parts with leakage were replaced, current work is nominal. Porch light fell apart and will have to be replaced next season. Kitchen faucet is leaking during movements from time to time.

Summary of Health and Safety Issues: Nominal.

Questions, Concerns, Supplies needed and Requests: Nothing to report

Operations Report – May 26th

Crew 281 Operations Report 26 May 2023

SOL: 12

Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer) and KC Shasteen (Crew Engineer)

Non-nominal systems:

Electrical outlets in kitchen

Remote observatory

EVA Helmet

Notes on non-nominal systems: None

ROVERS

Spirit rover used: No

Hours: (before EVA): 222.5

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

Opportunity rover used: Yes

Hours: (before EVA): 132.1

Hours: (after EVA): 133.2

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): 82%

Currently charging: Yes

Curiosity rover used: No

Hours: (before EVA): 241.0

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

Perseverance rover used: No

Hours: (before EVA): 264.6

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

General notes on rovers: Oppy used on long EVA to the special region north of the Gateway to Lith. Operation was nominal.

Summary of Hab operations:

WATER USE: 22.1 gallons

Water (static tank): 180.0 gallons

Static tank pipe heater (on or off): off

Static tank heater (On or off): off

Toilet tank emptied: no

Summary of internet:

nominal

Summary of suits and radios: All suits and radios are fully recharged.

Summary of GreenHab operations:

WATER USE: 1 gallons

Heater: Off

Supplemental light: Off

Harvest: in grams :

Tomatoes 3668

Lettuce 651

Micro greens 59

Chives 76

sage 42

basil 55

cucumber 1647

Summary of Science Dome operations:

Dual split: Heat and AC, Off

Cacao Experiment:

Watered cacao seedlings

Summary of RAM operations: (Tools used, work done)

None

Summary of any observatory issues: NA

Summary of health and safety issues:

No new issues to report.

Questions, concerns and requests to Mission Support: None

Operations Report – May 25th

Crew 281 Operations Report 25 May 2023
SOL: 11
Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer) and KC Shasteen (Crew Engineer)
Non-nominal systems:
Electrical outlets in kitchen
Remote observatory
EVA Helmet
Notes on non-nominal systems: None
ROVERS
Spirit rover used: No
Hours: (before EVA): 222.5
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Opportunity rover used: Yes
Hours: (before EVA): 131.2
Hours: (after EVA): 132.1
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 95%
Currently charging: Yes
Curiosity rover used: Yes
Hours: (before EVA): 240.2
Hours: (after EVA): 241.0
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 75%
Currently charging: Yes
Perseverance rover used: No
Hours: (before EVA): 264.6
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
General notes on rovers: Oppy and Curie used on long EVA to the intersection of Cow Dung and Hwy 1101 and back. Operation was nominal.
Summary of Hab operations:
WATER USE: 32.4 gallons
Water (static tank): 202.2 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet:
nominal
Summary of suits and radios: All suits and radios are fully recharged.
Summary of GreenHab operations:
WATER USE: 2.25 gallons
Heater: Off
Supplemental light: Off
Harvest: in grams : None
Summary of Science Dome operations:
Dual split: Heat and AC, Off
Cacao Experiment:
Watered cacao seedlings
Initial cleaning in preparation for exiting the station.
Summary of RAM operations: (Tools used, work done)
Initial cleaning completed in preparation for exiting the station.
Summary of any observatory issues: NA
Summary of health and safety issues:
No new issues to report.
Questions, concerns and requests to Mission Support:
Request Mission Support assistance to take down or retrieve the ham radio antenna in case of emergency or high winds.

Operations Report – May 24th

Crew 281 Operations Report 24 May 2023

SOL: 10

Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer) and KC Shasteen (Crew Engineer)

Non-nominal systems:

Electrical outlets in kitchen

Remote observatory

EVA Helmet

Notes on non-nominal systems: None

ROVERS

Spirit rover used: No

Hours: (before EVA): 222.5

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

Opportunity rover used: No

Hours: (before EVA): 131.2

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

Curiosity rover used: No

Hours: (before EVA): 240.2

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

Perseverance rover used: No

Hours: (before EVA): 264.6

Hours: (after EVA): NA

Beginning charge: (Before EVA): 100%

Ending charge: (On return from EVA, before recharging): NA

Currently charging: Yes

General notes on rovers:

Summary of Hab operations:

WATER USE: 33.4 gallons

Water (static tank): 234.6 gallons

Static tank pipe heater (on or off): off

Static tank heater (On or off): off

Toilet tank emptied: no

Summary of internet:

nominal

Summary of suits and radios: All suits and radios are fully recharged.

Summary of GreenHab operations:

WATER USE: 3.7 gallons

Heater: Off

Supplemental light: Off

Harvest: in grams :
Tomatoes 531
Cucumber 458
Chives 10

Summary of Science Dome operations:

Dual split: Heat and AC, Off

EVA & Research Planning

Cacao Experiment:

Watered cacao seedlings

Summary of RAM operations: (Tools used, work done)

None

Summary of any observatory issues: NA

Summary of health and safety issues:

No new issues to report.

Questions, concerns and requests to Mission Support:

Request Mission Support assistance to take down or retrieve the ham radio antenna in case of emergency or high winds.

Operations Report – May 23rd

Crew 281 Operations Report 23 May 2023
SOL: 9
Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer) and KC Shasteen (Crew Engineer)
Non-nominal systems:
Electrical outlets in kitchen
Remote observatory
EVA Helmet
Notes on non-nominal systems: None
ROVERS
Spirit rover used: No
Hours: (before EVA): 222.5
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Opportunity rover used: Yes
Hours: (before EVA): 130.0
Hours: (after EVA): 131.2
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 65%
Currently charging: Yes
Curiosity rover used: No
Hours: (before EVA): 240.2
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Perseverance rover used: No
Hours: (before EVA): 264.6
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
General notes on rovers: Oppy used on long EVA to Overlook Region and back.
Summary of Hab operations:
WATER USE: 13.9 gallons
Water (static tank): 269.0 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet:
nominal
Summary of suits and radios: All suits and radios are fully recharged.
Summary of GreenHab operations:
WATER USE: 1.59 gallons
Heater: Off
Supplemental light: Off
Harvest: in grams : 0
Summary of Science Dome operations:
Dual split: Heat and AC, Off
EVA & Research Planning
Cacao Experiment:
Watered cacao seedlings
Summary of RAM operations: (Tools used, work done)
None
Summary of any observatory issues: NA
Summary of health and safety issues:
No new issues to report.
Questions, concerns and requests to Mission Support:
Request Mission Support assistance to take down or retrieve the ham radio antenna in case of emergency or high winds.

Operations Report – May 22nd

Crew 281 Operations Report 22 May 2023
SOL: 8
Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer) and KC Shasteen (Crew Engineer)
Non-nominal systems:
Electrical outlets in kitchen
Remote observatory
EVA Helmet
Notes on non-nominal systems: None
ROVERS
Spirit rover used: Yes
Hours: (before EVA): 222.2
Hours: (after EVA): 222.5
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 78
Currently charging: Yes
Opportunity rover used: No
Hours: (before EVA): 130.0
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Curiosity rover used: No
Hours: (before EVA): 240.2
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Perseverance rover used: Yes
Hours: (before EVA): 264.3
Hours: (after EVA): 264.6
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 66%
Currently charging: Yes
General notes on rovers: None
Summary of Hab operations:
WATER USE: 39.9 gallons
Water (static tank): 281.9 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: yes
Summary of internet:
nominal
Summary of suits and radios: All suits and radios are fully recharged.
Summary of GreenHab operations:
WATER USE: 2.64 gallons
Heater: Off
Supplemental light: Off
Harvest: in grams : 0
Summary of Science Dome operations:
Dual split: Heat and AC, Off
EVA & Research Planning
Cacao Experiment:
Watered cacao seedlings
Summary of RAM operations: (Tools used, work done)
Fixed Patches for Ana and KC
Fabricated restraint for carrying drone on EVA
Summary of any observatory issues: NA
Summary of health and safety issues:
No new issues to report.
Questions, concerns and requests to Mission Support:
Request Mission Support assistance to take down or retrieve the ham radio antenna in case of emergency or high winds.

Operations Report – May 21st

Crew 281 Operations Report 21 May 2023
SOL: 7
Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer) and KC Shasteen (Crew Engineer)
Non-nominal systems:
Electrical outlets in kitchen
Remote observatory
EVA Helmet
Notes on non-nominal systems: None
ROVERS
Spirit rover used: No
Hours: (before EVA): 222.2
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Opportunity rover used: No
Hours: (before EVA): 130.0
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Curiosity rover used: No
Hours: (before EVA): 240.2
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Perseverance rover used: No
Hours: (before EVA): 264.3
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
General notes on rovers: None
Summary of Hab operations:
WATER USE: 17.2 gallons
Water (static tank): 321.8 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet:
nominal
Summary of suits and radios: All suits and radios are fully recharged.
Summary of GreenHab operations:
WATER USE: 1.98 gallons
Heater: Off
Supplemental light: Off
Harvest: in grams : 0
Summary of Science Dome operations:
Dual split: Heat and AC, Off
Cacao Experiment:
Watered cacao seedlings
Summary of RAM operations: (Tools used, work done)
Cleaned and inspected the Pegasus Scoop after the EVA test.
Summary of any observatory issues: NA
Summary of health and safety issues:
No new issues to report.
Questions, concerns and requests to Mission Support:
Request Mission Support assistance to take down or retrieve the ham radio antenna in case of emergency or high winds.

Operations Report – May 20th

Crew 281 Operations Report 20-05-2023
SOL: 6
Name of person filing report: Megan Kane (Commander), Ritupriya Patil (Executive Officer), and KC Shahteen (Crew Engineer)
Non-nominal systems:
Electrical outlets in kitchen
Remote observatory
EVA Helmet
Notes on non-nominal systems: None
ROVERS
Spirit rover used: No
Hours: (before EVA): 222.2
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
Opportunity rover used: Yes
Hours: (before EVA): 129.6
Hours: (after EVA): 129.9
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 94%
Currently charging: Yes
Curiosity rover used: Yes
Hours: (before EVA): 239.8
Hours: (after EVA): 240.2
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): 80%
Currently charging: Yes
Perseverance rover used: No
Hours: (before EVA): 264.3
Hours: (after EVA): NA
Beginning charge: (Before EVA): 100%
Ending charge: (On return from EVA, before recharging): NA
Currently charging: Yes
General notes on rovers: Curiosity and Opportunity were used.
Summary of Hab operations:
WATER USE: 34.5 gallons
Water (static tank): 339.0 gallons
Static tank pipe heater (on or off): off
Static tank heater (On or off): off
Toilet tank emptied: no
Summary of internet:
nominal
Summary of suits and radios: All suits and radios are fully recharged. There were intermittent issues transmitting from Hab during both EVAs. Signal was highly attenuated and difficult to hear (attention was paid to body positioning but did not seem to help signal). The same radios used outside the Hab that day (and on previous days) had no issues.
Summary of GreenHab operations:
WATER USE: 2.77 gallons
Heater: Off
Supplemental light: Off
Harvest: in grams : 0
Summary of Science Dome operations:
Dual split: Heat and AC, Off
Cacao Experiment:
Watered cacao seedlings
Summary of RAM operations: (Tools used, work done)
Scissors, twine, and tape were used to build Ritu’s drone payload carrying harness.
Glue was used for patch repair.
Summary of any observatory issues: NA
Summary of health and safety issues:
No new issues to report.
Questions, concerns and requests to Mission Support:
Request Mission Support assistance to take down or retrieve the ham radio antenna in case of emergency or high winds.