Operations Report – February 27th

Report title: Operations Report

Crew #: 330

Position: Crew Engineer

Report prepared by: Lou Goiffon

Date: 27-02-2026

Sol: 12

Non-nominal systems: The light for the toilets keeps switching from Empty to 1/3 even after 2 weeks of use and we can start to smell something.

Notes on non-nominal systems: N/A

ROVERS

Spirit rover used: No

Hours:

Beginning charge:

Ending charge:

Currently charging: YES

Opportunity rover used : Yes

Hours (Before EVA): 257.4

Beginning charge: 100%

Ending charge: 58%

Currently charging: YES

Curiosity rover used: Yes

Hours (Before EVA): 348.3

Beginning charge: 100%

Ending charge: 58%

Currently charging: YES

Perseverance rover used: No

Hours (Before EVA):

Beginning charge:

Ending charge:

Currently charging:

General notes on rovers:

Summary of Hab operations:

Water Use (see notes): 13.43 gal/d

Main tank level (remaining gallons, see notes): 115 gallons

Main water tank pipe heater (ON or OFF): ON

Main water tank heater (ON or OFF): ON

Toilet tank emptied (NO or YES): NO

Summary of internet: downlink 285.16 Mbits/s, uplink 38.18 Mbits/s, ping 32 ms

Summary of suits and radios:

– N°4 : Beginning charge 100%, ending charge 93%

– N°1 : Beginning charge 100%, ending charge 92%

– N°5 : Beginning charge 100%, ending charge 0%

All the GPS beacons worked very well

I changed the battery of the backpack 5 as it was dead and the new one is working well

Summary of GreenHab operations: (use information from the GreenHab report)

Water use: 2.5 gallons

Heater (ON or OFF): ON

Supplemental light (hours of operation): 6pm – 11:30pm

Harvest (name, weight in grams): 0

Summary of ScienceDome operations: Human factors experiments conducted

Dual split (Heat or AC, On or Off or Automatic): ON

Summary of RAM operations: N/A

Summary of any observatory issues: N/A

Summary of health and safety issues: None

Questions, concerns and requests to Mission Support: N/A

Copyright © The Mars Society. All rights reserved. | Main Site