Date: 12/13/2025
Name of person filing report: Ben Stanley
Reason for Report: Routine
Non-Nominal Systems: Crew car. Power system battery, inverters. Hab outer shell. Robotic observatory. Greenhab environmental sensor.
Power system:
Plan to overhaul inverter/battery system approved. Scheduled for January 2026.
1) 200 hr maintenance (including oil, oil filter, and air filter change) expected on 12/17/2025
2) Current generator hours – 822.1
Propane Readings:
Station Tank: 75%
Director Tank: 75%
Intern Tank: 73%
Generator Tank: 38%
Propane scheduled for 12/16
Water:
Hab Static Tank – 550 gallons (above safety level 130 gallons)
GreenHab – 200 gallons (above safety level 60 gallons)
Outpost tank – 440 gallons
Septic Tanks emptied: No
Rovers:
Sojourner rover used: No
Hours: 221.9
Beginning Charge: 100 %
Ending Charge: _ %
Currently Charging: Yes
Spirit Rover has a contactor issue so will not run, diagnosis in progress
Cars:
Hab Car used and why, where: To Hanksville for supplies
Crew Car used and why, where: To Hanksville for supplies, Grand Junction for crew pickup/drop off
General notes and comments: Crew car driver’s side front ball joint is bad
Summary of Internet: Nominal.
EVA suits and radios:
Suits: Nominal.
Comms: Unable to locate missing chest harness. UC Boulder crew purchasing replacement.
T-Echo EVA-link: Nominal
Campus wide inspection, if action taken, what and why: Nominal.
Summary of Hab Operations: Toilet valve repair completed 12/14.
Summary of GreenHab Operations: Environmental sensor failed. Unable to reconnect following battery replacement. Planning to replace sensor.
Summary of SciDome Operations: Nominal.
Summary of Observatories Operations: Robotic observatory failing to open. Motors are turning on, but there’s no movement. Planning to fix with help of Cesare and crew.
Summary of RAM Operations: Nominal.
Summary of Outpost Operations: Nominal.
Summary of Health and Safety Issues: Nominal.

