Operations Report – December 31st

Report title: Operations Report
Crew #: 326
Position: Crew Engineer
Report prepared by: Iris Stevenson
Date: 31-12-2025
Sol: 3

Non-nominal systems:

  • Power

Notes on non-nominal systems:

  • Several brownouts at 1150, 1208, 1257, and 1306. Switched to propane at 1415 following 1306 brownout.

ROVERS
Spirit rover used: NONFUNCTIONAL
Hours:
Beginning charge:
Ending charge:
Currently charging: No
Opportunity rover used: No
Hours:
Beginning charge:
Ending charge:
Currently charging: NO
Curiosity rover used: Health and Safety Officer and Crew Engineer
Hours: 342.0
Beginning charge: 100%
Ending charge: 46%
Currently charging: NO
Perseverance rover used: Greenhab Officer and Crew Engineer
Hours: 389.6
Beginning charge: 100%
Ending charge: 53%
Currently charging: NO
General notes on rovers:

Summary of Hab operations:
Water Use: 23.46 gal
Main tank level: 340.9 gal
Main water tank pipe heater: ON
Main water tank heater: ON
Toilet tank emptied: NO
Summary of internet: Nominal
Summary of suits and radios: Nominal
Summary of GreenHab operations: (use information from the GreenHab report)
Water use: 1 gallon
Heater: ON
Supplemental light: 4
Harvest: None
Summary of ScienceDome operations:

  • Crew Scientist used oven and his own tools to manufacture bricks for his research project with the help of the Crew Journalist

Dual split: Automatic
Summary of RAM operations:

  • Greenhab Officer used her own tools to finish her autonomous rover

Summary of any observatory issues:
Summary of health and safety issues:
Questions, concerns and requests to Mission Support:

  • Request that rovers Curiosity, Perseverance, and Opportunity are plugged in
  • Request for troubleshooting/recommendations for when to next empty toilet tank due to issues with level lights (such as average time to full with a crew of 7)
  • Request for trash in RAM airlock to be removed (bathroom trash on North edge, HAB non-burnable on South edge)