Operations Report – April 13th

Crew 314 Operations Report 13-04-2025

SOL: 7

Name of person filing report: Antoine Dubois (Engineer)

Non-nominal systems :

The number of cable ties have been checked.

Notes on non-nominal systems :

Cable ties: There are 4.5 packs of 50 zip ties (24"), approximately 50 zip ties (8"), and around 15 zip ties (6") in storage.

ROVERS

Spirit rover used : /

Opportunity rover used: EVA # 9

Hours: 215.8 (0.8 used).

Beginning charge: 100%

Ending charge: 44%

Currently charging: No

Curiosity rover used: EVA # 9

Hours: 308.3 (0.8 used)

Beginning charge: 100%

Ending charge: 65%

Currently charging: No

Perseverance rover used: /

General notes on rovers: /

Summary of Hab operations: Today in the Hab, we dedicated time to cooking, socializing, making progress on our experiments and advancing our individual reports. We also did some physical exercise to maintain our shape. During the afternoon, the fourth medical simulation took place, included in Odile’s experiment. To wrap up the day, we held our regular team meeting to review our progress and plan the tasks ahead.

Water Use (please use both methods to estimate water usage)

Time of measurements (collect data for the same time window): 7 p.m.
1) Per formula (see notes): 17.90 gallons
2) Smart Home Dashboard (see notes): 16.56 gallons

Water (static tank, remaining gallons): 326.11 gallons (per formula) & 339.12 gallons (Smart Home Dashboard)

Static tank pipe heater (on or off): off

Static tank heater (on or off) : off

Toilet tank emptied (no or yes): no

Summary of internet: Research for experiments, languages learning and music listening

Summary of suits and radios:

Radio : 3, 4, 5 et 6.

Suits : 7, 8, 9 et 10.

Summary of GreenHab operations: put notes here

I watered all the plants with water.

The door of the GreenHab was left open for 8 hours and 15 minutes (9.10 am to 5.25 pm) to reduce the temperature inside (maximum of 108.3 °F).

I watered and checked the seeds of the 3 small rectangular black pots (sprouts of China Rose radish) with the new cultures (Kale, Arugula and cress).

I removed Arugula plants because the plants were too old to be eaten.

I cut the dead branches of the tomato plants and tied up the overhanging branches.

I added stakes with a sticky paper to try to catch the drosophila present in the GreenHab.

I tied up the dill branches with a rope and tried to separate the different cultures (basil, dill, parsley, spring onions, chives, garlic) in the big blue pot.

I cleaned the floor of the GreenHab.

WATER USE: 9.5 gallons

Heater (On or Off): Heater on (setup temperature = 72 °F)

Supplemental light (hours of operation): 7-10 pm

Harvest (name, weight in grams): 6 spring onions, 8 rainbow cherries and 6 g of parsley

Summary of ScienceDome operations: put notes here

Check the condition of plantain seedlings and watering

Inoculation of soil samples (from the EVA) with spores of arbuscular fungi

Application of different stress (UV, gravity, temperature and control) conditions to soil samples (from EVA)

Batoul still made notable progress, adding a colored marker to each of her samples for future identification and analysis

Dual split (Heat or AC, On or Off): Off

Summary of RAM operations: We picked up the food cans and counted the number of cable ties at 5 p.m.

Summary of any observatory issues: The solar observatory was used in the morning. In the afternoon, cloud cover prevented further observations.

Summary of health and safety issues: Everyone was in good health today, with no issues reported. There were no safety concerns to note.

Questions, concerns and requests to Mission Support: Food requested by the crew was provided by the mission support

Copyright © The Mars Society. All rights reserved. | Main Site